E44-376 · Water Hammer and Pressure Surge · Two valves, upstream closed first · ★★
Closing the upstream valve first trapped the downstream water column; closing the other then generated Δp=1.0MPa beyond the allowable limit, buckling the downstream pipe.
[Mechanism] Closing upstream first traps the downstream column, and the next closure collides.
[Calculation] The negative wave buckled the downstream pipe.
[Design Omission] No closing sequence was defined and no simulation was run, so the wrong sequence caused hammer.
1) Define the closing sequence as downstream first, upstream later, to avoid trapping the column, because closing upstream first trapped the downstream, Δp=1.0 exceeded the limit and buckled it; hence correct sequence;
2) Limit the closing speed in the valve program, because fast closure generates hammer; hence speed limiting;
3) Close slow-closing valves in stages, because a single fast closure damages; hence staging;
4) Install a surge arrester to cut the wave, because the amplitude exceeds the limit; hence peak absorption;
5) Up-rate the downstream pipe against negative pressure, because negative pressure buckles it; hence higher rating;
6) Use water-hammer simulation to set the sequence, because estimates fall short; hence simulated sequencing;
7) Periodically rehearse the closing curve, because drift causes errors; hence curve rehearsal;
8) Write the closing sequence into the procedures, because the wrong original sequence was the root cause of the hammer; hence procedural control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection