E44-377 · Water Hammer and Pressure Surge · PRV stuck fully closed · ★★
A PRV sticking shut fully in an instant drove the downstream Δp=1.2MPa beyond the allowable limit and burst one downstream branch.
[Mechanism] The valve sticking fully closed cuts the flow, generating the wave Δp=1.2.
[Calculation] The exceeded limit burst the branch.
[Design Omission] No bypass was provided and full-closure sticking was not prevented, so abrupt closure caused hammer.
1) Fit a bypass valve on the PRV to prevent full-closure flow cut-off, because the stuck full closure drove Δp=1.2 beyond the limit and burst it; hence bypass maintains flow;
2) Add a stop to prevent the valve reaching the fully closed position, because sticking caused full closure; hence limiting stop;
3) Fit a relief valve downstream to limit Δp, because the amplitude exceeds the limit; hence relief;
4) Check the abrupt-closure Δp and up-rate the pipe, because the exceeded limit burst it; hence higher rating;
5) Provide a valve-position alarm to catch sticking early, because sticking is gradual; hence alarm;
6) Periodically service the valve plug to prevent sticking, because sticking is the source; hence servicing;
7) Recheck by water-hammer simulation, because estimates fall short; hence simulation;
8) Write full-closure prevention into the design, because the lack of prevention was the root cause of closure; hence design control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection