E44-392 · Water Hammer and Pressure Surge · Design Without Simulation · ★★
No water-hammer simulation was done in design, so the hump peak was missed; on commissioning Δp=1.4MPa exceeded the allowable and the pipe ruptured.
[Missed Calculation] No simulation meant the peak was unknown; in practice it exceeded the limit.
[Rupture] Δp=1.4 exceeds the allowable and ruptures.
[Design Omission] No water-hammer calculation or simulation was done; design relied on experience, and the hammer was missed.
1) Mandate full-context water-hammer simulation in design to find the peaks: no simulation missed the peak and caused Δp=1.4 exceedance and rupture; simulation drives protection layout;
2) Select protection and ratings from the simulated peaks: experience-based estimates fall short, so peaks drive selection;
3) Check instantaneous/indirect and reflected wave types: types differ in remedies, so the type is identified;
4) Stage arresters along the line: long waves stack, so staging is used;
5) Provide overpressure interlock: overpressure is hazardous, so interlock is used;
6) Rehearse start/stop curves before commissioning: drift shifts the peaks, so curves are rehearsed;
7) Re-simulate periodically as modifications and extensions occur: changes alter behavior, so simulation is refreshed;
8) Make water-hammer simulation a mandatory design item: the original missed calculation was the root cause of rupture, so it is enforced.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection