E44-396 · Water Hammer and Pressure Surge · Blind-End + Valve Combination · ★★
At a blind end with a valve group, the pressure wave fully reflects and superimposes; Δp=1.5MPa exceeds the allowable limit, and the valve-group flange cracked.
[Wave Superposition] The blind end fully reflects the wave, and peaks stack up at the valve group.
[Cracking] Δp=1.5 exceeds the allowable limit and caused cracking.
[Design Omission] No relief at the blind end and no surge absorption at the valve group — combined hammer.
1) Install a relief valve at the blind end to hold Δp within the allowable limit; full-reflection stacking drove it to 1.5 and cracked the line, so vent the pressure to cap the peak;
2) Add a surge arrester at the valve group to cut the wave; the wave was too strong, so absorb the peak;
3) Check the reflected stacked-peak distribution; hidden peaks were neglected, so compute the distribution;
4) Upgrade the flange rating at the valve group; over-limit pressure cracked it, so raise the pressure rating;
5) Use a slow-closing check valve to cut the source amplitude; the source surge was large, so close slowly;
6) Provide an overpressure interlock; overpressure is a hazard, so interlock for protection;
7) Run a water-hammer simulation to locate the peaks; estimates fell short, so simulate;
8) Write blind-end protection into the design; the missing relief was the root cause of the hammer, so close the loop at design.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection