E44-399 · Water Hammer and Pressure Surge · Liquid-Nitrogen Pipe -196℃ · ★★★
Pump shutdown in a liquid-nitrogen line lets the cold column collide; Δp=1.2MPa exceeds the allowable limit, and low-temperature brittle cracking caused a leak.
[Cold Hammer] The cold-column collision generated Δp=1.2.
[Cracking] Over the allowable limit and low-temperature brittleness combined to cause cracking and leakage.
[Design Omission] No cold-hammer resistance and no slow closure — cryogenic hammer.
1) Fit a slow-closing check valve plus a surge arrester on the LN₂ line to cut the cold hammer; the collision drove Δp to 1.2 and brittle cracking followed, so attenuate the hammer to protect the line;
2) Select austenitic stainless steel for cold brittleness resistance; carbon steel fails brittle, so use cold-tough material;
3) Check the cold-hammer Δp and upgrade the rating; over-limit pressure caused cracking, so raise the capacity;
4) Use a long-neck bonnet to isolate the cold and protect the seal; cold conduction destroys sealing, so thermally isolate;
5) Add cryogenic insulation to hold the temperature steady; thermal cycling causes cracking, so insulate;
6) Provide a leak alarm; a leak carries asphyxiation risk, so alarm on it;
7) Recheck by water-hammer simulation, because estimates fall short; hence simulation;
8) Write cold-hammer protection into the design; the missing cold resistance was the root cause, so close the loop at design.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection