Knowledge Base › Fluid Systems Error Case › Siphon High-Point Air Lock

Siphon High-Point Air Lock

E44-017 · Two-Phase Flow and Gas Binding · Evaporator Discharge Pipe · ★★

Problem Description

An air lock formed at the highest point of the discharge pipe, breaking the siphon and stopping discharge; the pipe had to be disassembled to vent air, four times a month.

Root Cause

[Air Lock] Gas accumulated at the pipe top without being vented; the gas occupies the cross-section and halves the effective bore.
[Flow Interruption] The gas binding makes the gravity-flow head Δp<0, breaking the siphon.
[Design Omission] No vent valve was provided at the high point, and pipe slope was not controlled; the air lock interrupted flow.

Corrective Solution

1) Provide an automatic vent valve at the pipe high point; gas at the top halves the effective bore and breaks flow when Δp<0, so continuous venting keeps the pipe full;
2) Control the pipe slope so the medium drains continuously with no gas pockets; a reverse slope traps gas into a lock, so a uniform slope drains liquid continuously;
3) Change the siphon crest to a rising inclined pipe to aid venting; an incline lets gas float up to the vent point, so it does not collect at the top;
4) Provide a vacuum-breaker valve to prevent siphon break; after flow stops, vacuum can collapse the pipe, so breaking the vacuum protects it;
5) Add sight glasses at key points to observe the air lock; air locks are hidden and hard to detect, so visual monitoring is used;
6) Vent first, then establish the siphon on startup; a siphon cannot be established with gas in the line, so vent before starting;
7) On commissioning, verify continuous discharge; continuous discharge is the criterion for a clear line, which gives acceptance;
8) Include vent points in the piping layout drawing; the original high point had no vent valve and was the root cause of the interruption, so the layout must mark them.

Checklist

Reference

GB/T 20801-2020 Pressure piping code

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »