Knowledge Base › Fluid Systems Error Case › Condenser Shell-Side Noncondensable Gas Accumulation

Condenser Shell-Side Noncondensable Gas Accumulation

E44-018 · Two-Phase Flow and Gas Binding · Shell-and-Tube Condenser · ★★

Problem Description

Noncondensable gas accumulating on the shell side cut the heat-transfer coefficient by 35% and dropped the vacuum by 3kPa, giving insufficient heat exchange.

Root Cause

[Noncondensable Accumulation] Air collected at the top of the shell side, occupying 15% of the cross-section and increasing thermal resistance.
[Temperature Difference] The noncondensable film lowers the wall temperature and reduces ΔTm, so Q=KAΔTm drops.
[Design Omission] No top vent port was provided for continuous venting, so noncondensable gas accumulated.

Corrective Solution

1) Provide a continuous vent port at the shell-side top to remove noncondensable gas; air at the top occupies 15% of the section and raises resistance, cutting K by 35%, so continuous venting preserves the heat-transfer surface;
2) Match the vent rate to the noncondensable load; venting too little still lets gas accumulate, venting too much loses working fluid, so vent proportionally to the load;
3) Check the vacuum-system capacity; insufficient extraction lets noncondensables build up, so ensure adequate capacity;
4) Regularly measure vacuum and terminal difference for monitoring; a 3kPa vacuum drop and rising terminal difference signal gas accumulation, giving trend early warning;
5) Install a distributor at the inlet to spread the gas evenly; uniform distribution keeps gas from collecting at the top, reducing accumulation;
6) Add shell-side baffles to enhance heat transfer; baffling lengthens the flow path and strengthens turbulence, recovering part of K;
7) On commissioning, measure the heat-transfer coefficient up to the design value; when K recovers, heat exchange is sufficient, giving acceptance;
8) Include vent design in the heat-exchanger process specification; the original lack of a vent port was the root cause of accumulation, so the process must include it.

Checklist

Reference

GB/T 151-2014 Heat exchangers

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL