Knowledge Base › Fluid Systems Error Case › Suction-Pipe Flange Air Leak

Suction-Pipe Flange Air Leak

E44-067 · Two-Phase Flow and Gas Binding · Centrifugal-Pump Suction Pipe · ★★

Problem Description

A leaking flange in the vacuum section sucked in air; pump output dropped 30%, vibration severity reached 6mm/s, and cavitation noise appeared.

Root Cause

[Air Entry] A flange in the vacuum section leaked; air entered the pump with the liquid, and the gas fraction caused cavitation and flow interruption.
[Calculation] The leak made the inlet gas fraction >2%, cutting the pump head by 30%.
[Design Omission] The vacuum section was not made airtight and no vent was provided; air entry reduced efficiency.

Corrective Solution

1) Perform an air-tightness test on the vacuum-section flanges (pull vacuum and hold pressure); air is drawn in at the vacuum section, and an air-tightness test finds the leak, eliminating the air source and restoring pump output;
2) Provide a high-point vent valve to remove accumulated gas; even a slight leak draws air, but timed venting keeps the gas fraction from accumulating, maintaining head;
3) Replace the gasket with a temperature-resistant seal to keep the flange tight; the original gasket failed and leaked, so a new gasket restores the seal and stops the leak;
4) Provide inlet vacuum monitoring (alarm when the vacuum reading is abnormal); a leak lowers the vacuum, so monitoring catches it early for timely action;
5) Select an anti-cavitation impeller; air entry induces cavitation, and a cavitation-resistant impeller tolerates gassed service, reducing vibration and damage;
6) Periodically check flange bolting and gasket condition; flange loosening is gradual, so periodic inspection prevents leaks and maintains the seal;
7) On commissioning, measure output up to the design value; the 30% output drop is the key indicator and must be measured, giving acceptance;
8) Make air-tightness a mandatory item in the installation specification; the vacuum section was installed without air-tight testing, causing air entry, so it is controlled at installation.

Checklist

Reference

GB/T 13006-2013 Centrifugal pumps — Efficiency