E44-068 · Two-Phase Flow and Gas Binding · Shell-and-Tube Heat Exchanger · ★★
Noncondensable gas on the shell side reduced the effective heat-transfer area, cutting overall K by 25%; the outlet temperature missed the target by 6℃.
[Gas Accumulation] Noncondensable gas collected at the high points of the shell side, occupying heat-transfer area and raising thermal resistance.
[Calculation] Gas occupying 15% of the area cut the effective K by about 25%, leaving the outlet temperature difference insufficient.
[Design Omission] No high-point vent was provided and noncondensables were not controlled; gas accumulation reduced efficiency.
1) Provide vent valves at shell-side high points; noncondensables collect at shell-side highs, where venting is most thorough, restoring effective heat-transfer area and recovering K;
2) Periodically vent noncondensables (based on pressure-difference trend); gas is continuously generated, so periodic venting prevents re-accumulation and keeps K stable;
3) Slope the shell side toward the vent (so gas naturally flows to the vent point); the slope carries gas to the vent instead of letting it linger, purging it completely;
4) Monitor the overall heat-transfer coefficient K and terminal difference; a 25% drop in K indicates gas accumulation, and monitoring quantifies it for early detection and venting guidance;
5) Control the source of noncondensables (e.g., deaerate makeup water); reducing gas at source reduces accumulation, cutting vent frequency;
6) Provide inlet/outlet temperature-difference measurement points; the 6℃ outlet miss is the symptom, and measuring the temperature difference back-calculates K to verify the fix;
7) On commissioning, measure K up to the design value; heat exchange is the core function and must be measured, giving acceptance;
8) Include venting in the heat-exchanger design; the original lack of high-point venting caused accumulation, so vent points are laid out at the design stage.
GB/T 151-2014 Heat exchangers