E44-169 · Two-Phase Flow and Air Binding · Feed-Pump Suction Line · ★★
A tiny leak at the suction-line flange drew in air; the pump ran gas-liquid two-phase, with cavitation vibration at 89dB.
[Air Ingress] The flange leak sucked air into the pump.
[Two-Phase] The gas-liquid mixture caused cavitation and vibration.
[Design Omission] No suction-seal check and no vent — vibration.
1) Vacuum-test the suction flange for leaks and keep it sealed; the leak drew in air and caused two-phase cavitation vibration, so find the leak and keep the seal;
2) Fit a vent valve on the suction line to bleed accumulated gas; gas was entering the pump, so vent it;
3) Torque the suction-line fittings to prevent loosening leaks; vibration loosened them, so secure them;
4) Add cavitation-vibration monitoring on the pump; air ingress shows abnormal vibration, so monitor it;
5) Size the suction bore to prevent vortexing; vortices entrain air, so keep the bore adequate;
6) Keep the tank liquid level above the inlet submergence to prevent air ingestion; a low level sucks air, so hold the level;
7) Test-run to verify no air-ingress cavitation vibration; the design requires measured verification, so confirm at handover;
8) Write suction sealing into the installation scope; the unchecked seal was the root cause of air ingestion, so installation must include it.
GB/T 13006-2013 Centrifugal pumps, mixed-flow pumps and axial-flow pumps — Cavitation allowance