E44-1048 · Two-Phase Flow and Gas Binding · Riser · ★★
Gas binding, liquid interruption, shutdown
[Mechanism] Gas collected at the riser top and formed an air lock; the liquid column was cut off and downstream flow stopped.
[Calculation] Riser H=8m; top air lock 1.2m long; downstream flow dropped from 50m³/h to 0; the lock occupied 60% of the cross-section.
[Design Omission] No top vent, no slope check, and no air-lock calculation.
1) Provide an automatic vent valve at the riser top (DN25); the air lock interrupted flow, and venting restores it, giving flow recovery;
2) Check the pipe slope (slope upward in flow direction, no reverse slope trapping gas); a reverse slope traps gas, and correcting the slope vents it, preventing the lock;
3) Add vent valves (one every 30m); the air lock cut flow, and venting restores it, giving flow recovery;
4) Keep the pipe-top elevation smooth (no sags); sags trap gas, and a smooth elevation vents it, leaving no gas pocket;
5) Run a flow-through test (measured flow ≥50m³/h); the interruption was never checked, so measured data confirms flow, sizing the flow by data;
6) Install flow monitoring (alarm on interruption); interruption first shows up as a flow drop, so early warning gives flow monitoring;
7) In operation, maintain a full pipe (no gas at high points); the air lock caused interruption, and keeping it full stabilizes flow, preventing interruption in service;
8) Write venting and slope check into the calculation report; the root cause of riser gas binding is no venting and a reverse slope, so calculations gate it.
GB/T 20801.3-2020 Design code for industrial metallic piping