E44-458 · Filter Clogging and Contamination · Duplex Strainer DN80 · ★★

Problem Description

Internal leakage in the duplex switching valve let oil cross between the running and standby chambers; dirt accumulated in the standby chamber and back-flushed, outlet debris was 0.05%, and filtration failed.

Root Cause

[Mechanism] The switching-valve sealing face is scored and does not shut tightly, causing chamber cross-leakage.
[Calculation] Internal leakage q=CD·A·√(2Δp/ρ); at Δp=0.1MPa, q=3L/min, and cross-leaked dirt raises outlet to 0.05%.
[Design Omission] No post-switching isolation test was done and the valve was not serviced; internal leakage carried dirt across.

Corrective Solution

1) Recondition the switching-valve sealing face and perform a 0.6MPa pressure-hold leak test, because the original face was scored, q=3L/min crossed dirt and outlet was 0.05%, thereby sealing it tight;
2) After switching, open the standby chamber, drain it and check for debris, because cross-leakage shows up as debris, thereby verifying isolation;
3) Tighten the valve-stem packing against external leakage, because loose packing leaks, thereby tightening packing;
4) Add check valves on both chambers to prevent back-flushing, because back-flushing dirties the standby chamber, thereby checking reverse flow;
5) Require two-person verification of the switching checklist point, because the isolation test is easily missed, thereby double-checking;
6) Periodically overhaul and inspect the valve, because wear progresses, thereby scheduling inspection;
7) Install a particle counter at the outlet, because cross-leaked dirt is measurable, thereby monitoring particles;
8) Write the isolation test into the operation card, because the original missing test is the root cause of cross-leakage, thereby enforcing operational control.

Checklist

Reference

GB/T 26114-2010 Filters for liquid filtration