E44-1059 · Filter Clogging and Fouling · Strainer Mesh · ★★
Mesh damage, debris breakthrough, fouling
[Mechanism] The mesh is eroded by high-velocity particles or nicked during installation, develops holes, and debris penetrates downstream.
[Calculation] A Φ5mm hole in the mesh, downstream valves stuck 3 times, debris penetration rate 8%, and equipment wear.
[Design Omission] The damaged mesh was not replaced, integrity was not checked, and no mesh guard was fitted.
1) Replace the damaged mesh with a full new screen, since holes let debris through and a new screen stops it, thus ending the breakthrough;
2) Verify mesh integrity (light-transmission check for holes), since damage causes leakage and the check confirms it, thus ensuring sealing;
3) Add a protective coarse screen upstream to resist impingement, since impingement damages the mesh and the guard protects it, thus resisting erosion;
4) Lower and stabilize the flow velocity (v≤2m/s), since high velocity damages the mesh and slowing it eases the load, thus protecting the mesh;
5) Run a filtration test (downstream debris ≤1%), since breakthrough went unchecked and measurement confirms cleanliness, thus sizing filtration by data;
6) Fit downstream debris monitoring (alarm on exceedance), since breakthrough first shows as debris and early notice gives warning, thus alarming on debris;
7) Keep the medium clean in operation (remove large particles upstream), since heavy debris damages the mesh and cleanliness protects it, thus preventing damage in service;
8) Write mesh replacement and integrity checking into the specification, since the root cause of mesh damage was failure to replace and verify integrity, thus controlling to spec.
HG/T 21637-1991 Chemical-industry piping filters