Self-Cleaning Filter Not Put Into Service

E44-1062 · Filter Clogging and Fouling · Self-Cleaning Filter · ★★

Problem Description

Not commissioned, clogging, flow drop

Root Cause

[Mechanism] The self-cleaning filter was not put into service and relied on manual cleaning; cleaning was too infrequent, so it clogged and downstream flow dropped.
[Calculation] Self-cleaning was off, the cleaning interval was 30 days (should be 1 day), clogging reached 60%, ΔP=0.3MPa, and flow dropped by 35%.
[Design Omission] Self-cleaning was not commissioned, the cleaning cycle was not verified, and no pressure-difference start was set.

Corrective Solution

1) Put self-cleaning into service (automatic backwash at 0.1MPa pressure difference), since leaving it off causes clogging and commissioning cleans it, thus lowering pressure drop;
2) Verify the cleaning cycle (30s backwash each time, 1-day interval), since a wrong cycle causes clogging and correcting it cleans promptly, thus keeping cleaning timely;
3) Set pressure-difference start/stop (start at ΔP>0.1, stop at <0.05), since clogging triggers a start and the differential controls it, thus operating automatically;
4) Increase the screen dirt-holding capacity (larger cavity), since small capacity clogs and larger capacity eases it, thus resisting clogging;
5) Run a cleaning test (ΔP≤0.08 after backwash), since clogging went unverified and measurement confirms cleanliness, thus sizing cleaning by data;
6) Fit pressure-difference and running monitoring (alarm if not commissioned), since a disabled cleaner first shows as pressure differential and early notice gives warning, thus alarming on cleaning status;
7) Enforce commissioning in operation (no manual substitute), since delay causes clogging and enforced commissioning keeps it clean, thus preventing clogging in service;
8) Write commissioning and cycle verification into the specification, since the root cause was leaving self-cleaning off and not verifying the cycle, thus controlling to spec.

Checklist

Reference

HG/T 21637-1991 Chemical-industry piping filters