E44-024 · Heat-Exchanger Fouling and Insufficient Heat Transfer · Falling-Film Evaporator · ★★
Heating-tube coking cuts evaporation by 25% and raises steam consumption; decoking shutdown runs 2 days/month.
[Coke Layer] Coke deposits raise the wall temperature and cause local overheating.
[Dry Wall] Uneven liquid-film distribution causes dry patches and worsens heat transfer.
[Design Omission] Feed concentration was not controlled and no online cleaning was provided; coking caused the drop.
1) Control feed concentration and flow to prevent dry wall, since too high a concentration / too low a flow thins the film and causes local dry-wall overheating and coking, thus stabilizing the film to prevent coke;
2) Use a distributor to spread the film evenly and prevent maldistribution, since flow maldistribution leaves some tubes dry and others overloaded, thus wetting all tubes for uniform heat transfer;
3) Provide online cleaning (CIP) to remove coke, since wall-bound coke cuts evaporation by 25% and decoking shutdown runs 2 days/month, thus dissolving coke online for continuous operation;
4) Limit heating-steam temperature and pressure, since over-temperature accelerates coking and raises wall temperature, thus restraining coke by limiting;
5) Periodically decoke mechanically to restore heat transfer, since mechanical coke removal returns K to design, thus restoring on a cycle;
6) Monitor tube-to-tube temperature differences to detect coking, since a coked tube deviates in temperature from normal, thus giving temperature-difference warning;
7) Measure evaporation to design value on test run, since restored evaporation means sufficient heat transfer, thus accepting the unit;
8) Bring concentration control into the process sheet, since the original lack of concentration control was the root cause of coking, thus constraining it in the process.
GB/T 151-2014 Heat exchangers