E44-519 · Heat Exchanger Fouling and Insufficient Heat Transfer · Geothermal Heat Exchanger Titanium · ★★
Geothermal water scale plugging, K drop, heat-extraction loss
[Mechanism] High-mineral geothermal water deposits on the wall.
[Calculation] Rf=0.5 cuts K by 45%, lowers extracted Q, and reduces efficiency.
[Design Omission] No scale inhibition and no flushing, so scale plugs the unit.
1) Dose scale inhibitor and flush on schedule to keep Rf<0.15; high-mineral geothermal water bonds to the wall (Rf=0.5, K drop 45%, heat extraction down), so inhibition and flushing restore K;
2) Pre-settle inlet water to remove heavy minerals; high mineral load settles readily, so pre-settling cuts the load;
3) Fit online K monitoring (alarm on 10% K drop); scaling shows up first as a K drop, so monitoring gives early warning;
4) Change to corrosion-resistant material (titanium / duplex steel); geothermal water is highly corrosive and corrosion aids scaling, so corrosion resistance extends life;
5) Raise flow velocity to prevent settling (≥1.5 m/s); minerals settle in low-velocity zones, so higher velocity suppresses scaling;
6) Use a side-stream filter to cut minerals; accumulated minerals aid scaling, so side filtration reduces the load;
7) Inspect scale thickness on schedule (thickness gauge); scale thickens and heat extraction drops, so inspection guides flushing;
8) Write scale inhibition and scheduled flushing into the geothermal procedure; the original design omitted inhibition and flushing, the root cause of scale, so the procedure closes the loop.
GB/T 151-2014 Heat exchangers