Seawater Desalination Heat Exchanger Fouling

E44-544 · Heat Exchanger Fouling and Insufficient Heat Exchange · Titanium Seawater Desalination Heat Exchanger · ★★

Problem Description

Marine growth and fouling, reduced K, lower water production

Root Cause

[Mechanism] Marine organisms and scale deposit on surfaces.
[Calculation] A fouling layer with Rf=0.4 lowers K by 35% and cuts water production by 15%.
[Design Omission] No chlorination and no flushing, so fouling occurred.

Corrective Solution

1) Chlorinate to suppress fouling (residual chlorine 1-2mg/L) and flush; because marine growth and scale adhere, and Rf=0.4 lowers K by 35% and cuts production by 15%, chlorination suppresses adhesion while flushing removes deposits and restores K;
2) Install rotating brushes (online tube brushing, run each shift); because the fouling layer thickens and brushing restores α, rotating brushes clean the tubes;
3) Monitor water production (alarm when production <85% of design); because fouling lowers K first as reduced production, well before supply interruption, monitoring gives early warning;
4) Apply antifouling coating to titanium surfaces (antifouling paint / copper-nickel); because marine organisms readily adhere to titanium and coatings reduce adhesion, antifouling suppresses growth;
5) Raise flow velocity (≥1.5m/s) to prevent adhesion; because marine organisms settle and adhere in low-velocity zones and harden over time, higher velocity reduces residence time and suppresses adhesion;
6) Schedule high-pressure flushing (high-pressure backwash every 24h); because deposits harden and become difficult to remove, high-pressure flushing restores passages on a regular basis;
7) Rotate standby tubes (parallel standby tubes, switch over during cleaning); because tube cleaning requires shutdown and production loss, rotation keeps production continuous;
8) Write chlorination and flushing into the seawater desalination procedure; because the original design omitted chlorination and flushing, the root cause of fouling, the procedure closes the loop.

Checklist

Reference

GB/T 151-2014 Heat exchangers