E44-130 · Uneven Flow Distribution · Plant water distribution network · ★★
The near-end flow exceeds the design by 40%, the far end is short of pressure with no water, hydraulic imbalance
[Detuning] The impedances do not match.
[Calculation] A small near-end resistance means a large Q there and a small one at the far end, so the system is out of balance.
[Design Omission] No balancing was provided, so the system is out of balance.
1) Perform the distribution-piping hydraulic calculation by the equal-pressure-drop method, because matching the impedance evens the flow, thereby distributing it evenly;
2) Fit a balancing valve on each branch to adjust the flow, because adjustability evens it, thereby keeping the near end from over-flowing;
3) Fit a restrictor orifice at the near end, because limiting the excess evens the flow, thereby controlling it;
4) Lay out symmetrically to reduce flow deviation, because symmetry evens the flow, thereby steadying it;
5) Install multi-point flow meters for monitoring, because it reveals the imbalance, thereby adjusting early;
6) Validate with flow-field simulation, because it screens the design beforehand, thereby optimizing it;
7) Measure at commissioning that the flow difference between points is ≤10%, because the design requires measurement, thereby confirming delivery;
8) Build the balancing into the water distribution design, because the imbalance was the main cause, thereby freezing it to prevent recurrence.
GB/T 20801.3-2020 Pressure piping code - Industrial piping - Design