E44-745 · Uneven Flow Distribution · Two-phase distribution · ★★
Two-phase unevenness, deviation, phase separation
[Mechanism] The two phases distribute unevenly and the flow deviates.
[Calculation] Phase separation causes the deviation.
[Design Omission] No distribution, no verification, and no inspection were provided, so the two phases separate.
1) Provide a two-phase distributor (even gas and liquid distribution, balanced phases), because the original two-phase deviation left the gas fraction of the outlets differing by >15%, thereby distributing the phases evenly;
2) Verify the gas content at each outlet (sample gas at each outlet, difference ≤5%), because a difference makes the distribution uneven, thereby verifying the gas;
3) Keep the phase split steady (phase-split meter, even distribution), because changing conditions cause deviation and control evens them, thereby controlling the phases;
4) Standardize the pipe diameter against deviation (same diameter at every outlet), because a diameter difference causes deviation and standardization evens it, thereby standardizing the diameters;
5) Monitor the deviation (observe each outlet, verify on any deviation), because gradual deviation is invisible and monitoring catches it, thereby giving early warning;
6) Run a phase test (sample at each outlet, accept when even), because the lack of testing caused the deviation and testing verifies it, thereby testing the phases;
7) Clean the distributor against blockage (clean at fixed intervals, remove blockages), because blockage causes deviation and cleaning restores flow, thereby cleaning the distributor;
8) Write the distribution and gas verification into the specification (gas-fraction uniformity), because the missing distributor was the root cause and freezing it into the specification enforces control.
GB/T 20801.3-2020 Design code for industrial metallic piping