E44-761 · Uneven Flow Distribution · Pipe Network · ★★
Each loop's flow biased >20%, the near end over-supplied and the far end starved
[Mechanism] The loop resistances are not balanced.
[Calculation] A resistance difference biases the far-end flow >20% while the near end oversupplies.
[Design Omission] No balance calculation was done and no balance valves were fitted, so the system was imbalanced.
1) Do a hydraulic balance calculation for the network (match each loop's impedance, keep the most unfavorable loop's surplus pressure ≥0.03MPa), because the omitted balancing left the loop resistances different and biased the far-end flow >20% while the near end oversupplied, thereby distributing the flow evenly by calculation;
2) Fit and adjust balance valves (fit one on each branch and adjust to the calculated opening until the flows are even), because a bias makes the flows differ and valve adjustment balances them, thereby evening the flow;
3) Verify each loop's resistance (measure and compute each loop's Δp/flow to derive its impedance), because the original estimate left the resistances different and biased the flow, thereby verifying the resistance by measurement;
4) Uniform the pipe diameters (keep same-run diameters consistent against resistance differences), because a diameter difference raises the resistance and biases the flow and uniformity flattens it, thereby reducing the difference;
5) Check for imbalance (monitor each terminal's flow, alarm above 15% deviation), because gradual deviation starves the far end and early detection helps, thereby monitoring the deviation;
6) Run a hydraulic test (open all valves, commission jointly, and record each loop's flow), because the omitted test let the bias go unnoticed and the operation ran abnormally, thereby proving even distribution;
7) Control the total pressure (keep the total pressure steady against single-loop upsets), because a total change shifts the balance point and reintroduces the bias, thereby steadying the total;
8) Write the balancing and resistance calibration into the calculation report, because the omitted balancing was the root cause of the resistance problem and the report enforces it, keeping the hydraulics even.
GB/T 20801.3-2020 Design code for industrial metallic piping