Knowledge Base › Fluid Systems Error Case › Biased Flow from Shutdown Water Hammer

Biased Flow from Shutdown Water Hammer

E44-770 · Uneven Flow Distribution · Shutdown · ★★

Problem Description

Shutdown water hammer, Δp >0.3MPa, biased flow

Root Cause

[Mechanism] An abrupt stop produces water hammer and disrupts the valve sequence.
[Calculation] Abrupt stopping drives the Δp >0.3MPa and vibrates the pipe, biasing the flow.
[Design Omission] Nothing was slowed on shutdown and no soft-closing valve was provided, so water hammer occurred.

Corrective Solution

1) Close the shutdown valve slowly to prevent water hammer (closing rate ≤5%/s), because the original abrupt shutdown drove the Δp >0.3MPa and vibrated the pipe, biasing the flow, thereby steadying the flow by slow shutdown;
2) Provide a soft-closing check valve (closing time ≥10s against reverse-flow hammer), because a steep closure produces hammer and soft closing reduces it, thereby suppressing the hammer;
3) Add a pressure-relief valve (relieve above 1.1 times the setting), because hammer raises the pressure and relief lowers it, thereby protecting the pipe;
4) Verify the closing sequence against disorder (close branch by branch in order, branches before the main), because a disordered sequence biases the flow and ordering equalizes it, thereby steadying by sequence;
5) Check for hammer (monitor the pressure transient, alarm above Δp >0.25MPa), because gradual hammering fatigues the pipe and early detection helps, thereby monitoring for hammer;
6) Limit the rate of change (reduce the pump frequency at ≤10%/s), because an abrupt change causes hammer and rate limiting steadies it, thereby steadying by limiting the rate;
7) Run a shutdown test (simulate shutdown and record the pressure curve), because the omitted test let the hammer go unnoticed and the operation ran abnormally, thereby proving a steady stop;
8) Write the slow shutdown and soft closing into the operating card, because the omitted slowing was the root cause of the hammer and the operating card enforces it, steadying the shutdown.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping