Knowledge Base › Fluid Systems Error Case › Imbalance After Pipe-Network Cleaning

Imbalance After Pipe-Network Cleaning

E44-771 · Uneven Flow Distribution · Pipe Network After Cleaning · ★★

Problem Description

After cleaning, each loop's flow deviated >20% and the balance was lost

Root Cause

[Mechanism] Cleaning disturbs the balance valves, and scale shedding changes the resistance.
[Calculation] Scale shedding changes the loop resistance and biases the flow >20%.
[Design Omission] Nothing was rebalanced and nothing was calibrated, so the flow was uneven.

Corrective Solution

1) Rebalance the pipe network (remeasure each loop's flow and re-adjust the balance valves after cleaning), because the scale shedding after cleaning changed the loop resistance and biased the flow >20%, thereby rebalancing the flow;
2) Calibrate each loop's flow (remeasure and compare with the design), because off-design conditions bias the flow and calibration reveals it, thereby tuning it accurately by measurement;
3) Reset the balance valves (recompute the openings for the new resistance), because any change biases the flow and resetting balances it, thereby distributing the flow evenly by resetting;
4) Run a balance test (open all valves, commission jointly, and record each loop's flow), because the omitted test let the deviation go unnoticed and the operation ran abnormally, thereby proving even distribution;
5) Monitor the deviation (monitor the flow at each terminal, alarm above 15% deviation), because the deviation grows gradually and starves some branches and monitoring gives early warning, thereby monitoring the deviation;
6) Control the total pressure (keep the total pressure steady against fluctuation), because off-design conditions reintroduce the bias and stabilization preserves it, thereby stabilizing the pressure;
7) Inspect the balance at intervals (always rebalance after cleaning), because gradual deviation causes long-term inaccuracy and periodic inspection prevents it, thereby keeping the balance;
8) Write the rebalancing and flow calibration into the maintenance card, because the omitted rebalancing was the root cause of the cleaning problem and the maintenance card enforces it, keeping the flow even after cleaning.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping