E44-082 · Level Control Failure · Capacitance Level Gauge on Slurry Tank · ★★
Material coating the electrode made the capacitance level gauge read a false high of 0.3m, so draining fell short and the product concentration failed
[Coating] Material coating the electrode changes the capacitance, so the reading runs falsely high.
[Calculation] The coating increases the equivalent capacitance and displays a false high of 0.3m.
[Design Omission] No anti-coating type was selected and nothing was cleaned periodically, so the coating caused a false high.
1) Select a coaxial anti-coating electrode, because slurry coating the wall changes the capacitance and a coaxial structure is little affected by the coating, thereby keeping the reading free of coating-induced false highs;
2) Clean the wall and electrode at intervals, because accumulated coating causes a false high of 0.3m and periodic cleaning restores the reading, thereby maintaining accuracy;
3) Provide purging against sticking (air knife or flushing), because purging keeps material from attaching and reduces coating at the source, thereby lowering the cleaning frequency;
4) Verify by dual-meter comparison (capacitance + radar/weighing), because coating on a single meter is hard to notice and a dual-meter deviation alarm detects it, thereby correcting it early;
5) Apply zero migration (coating compensation), because fixed coating can be compensated in software and the migrated reading is true, thereby reducing the false high;
6) Compare the material level with the weighing, because the weighing is the reference and comparison verifies the capacitance reading, thereby confirming accuracy;
7) Prove on trial run that the display is accurate (compared with the calibrated level), because inaccurate metering causes wrong batching and the trial run provides the measurement, thereby accepting the installation;
8) Include anti-coating requirements in the selection standard, because the omitted anti-coating type caused the false high and the selection must be based on the media right from the selection stage.
GB/T 20819-2018 Process control — System evaluation