Knowledge Base › Fluid Systems Error Case › Liquid Carryover in the Vapor Phase Making the Level Read Falsely High

Liquid Carryover in the Vapor Phase Making the Level Read Falsely High

E44-630 · Level Control Failure · Vapor-phase liquid carryover · ★★

Problem Description

Vapor carryover, reading high, false pressure increase

Root Cause

[Mechanism] Liquid carried in the vapor phase raises the pressure.
[Calculation] The carryover makes the reading falsely high.
[Design Omission] The liquid was not removed, not separated and no correction was added — so it carried over.

Corrective Solution

1) Add a vapor-liquid separator to remove the liquid (wire-mesh mist eliminator efficiency ≥98%, droplet size ≥5μm): because the original vapor carried droplets (about 3% liquid) that added a liquid column on the vapor side of the differential-pressure transmitter and made the reading falsely high by 0.2m, separating removes the liquid so the vapor side is pure gas pressure and the reading returns to the true liquid column;
2) Provide a top drain valve (drain once per shift, fully draining the accumulated liquid): because accumulating liquid increasingly offsets the pressure and draining clears it, the zero is maintained;
3) Lower the vapor velocity against carryover (vapor line velocity ≤10m/s, avoiding entrainment): because a high velocity (>15m/s) picks up liquid and lowering it reduces entrainment, carryover is reduced;
4) Calibrate the vapor-side zero (vent and fill before commissioning): because trapped liquid causes a falsely high reading and zero calibration corrects it, the reference is accurate;
5) Choose a suitable tapping location (take-off point more than 0.5m above the liquid interface): because a low tap carries liquid and a high one avoids it, the measurement is steady;
6) Check for carryover (inspect the separator for accumulated liquid weekly): because gradual carryover increases the offset and checking gives early warning, draining is timely;
7) Control entrainment (add a defoaming plate): because entrainment causes error and a defoaming plate reduces it, entrainment is controlled;
8) Write the separation and draining into the process card: the original lack of liquid removal was the root cause of the carryover, so the card locks it in and the process governs it.

Checklist

Reference

GB/T 17614.1-2008 Transmitters for use in industrial-process control systems

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »