E44-666 · Level Control Failure · Calibration · ★★
Overdue, drifted, losing accuracy
[Mechanism] Overdue calibration causes the drift.
[Calculation] The lapse in calibration causes the drift.
[Design Omission] No calibration interval was set, no records kept and no checks made — so the calibration lapsed.
1) Set the calibration interval (pressure type ≤ half a year, magnetic float ≤ 1 year): because the overdue calibration drifted the reading (0.3%FS off) and periodic calibration corrects it, the reading returns to accuracy;
2) Keep calibration records (a log noting the next due date): because without records it lapses and a record reminds, no calibration is missed;
3) Calibrate zero and full (empty / full calibration, error ≤0.5%): because drift causes the lapse and calibration corrects it, the calibration is confirmed;
4) Attach a calibration sticker (a tag showing the next due date): because a missed record lapses and the sticker shows it, overdue use is avoided;
5) Select a zero-stable instrument (zero temperature drift <0.01%FS/℃): because drift offsets the reading and a stable zero keeps it accurate, the reading is steady;
6) Check the offset (compare against a gauge daily): because gradual drift misleads and checking gives early warning, calibration is timely;
7) Lock out overdue instruments (no metering use once overdue): because overdue misleads and the lockout stops it, no error occurs;
8) Write the calibration schedule and records into the maintenance card: the original lack of a schedule was the root cause of the overdue calibration, so the card locks it in and maintenance governs it.
GB/T 17614.1-2008 Transmitters for use in industrial-process control systems