E44-034 · Piping Supports and Thermal Expansion · Steam pipeline · ★★★
Thermal elongation of an uncompensated straight pipe, ΔL=αLΔT=12e-6×60×200=0.144m, deforms the bends and leaks the flange
[Thermal Elongation] With no compensation, ΔL=αLΔT=0.144m loads the anchor support with F=EAΔL/L beyond the allowable.
[Leakage] The flange bolts are pulled askew and the seal fails.
[Design Omission] No Π-bend or bellows expansion joint was provided and the thermal elongation was not calculated — so the thermal growth leaked the flange.
1) Provide a Π-bend or bellows expansion joint in the piping: because the thermal elongation of the uncompensated straight pipe, ΔL=αLΔT=0.144m, loaded the anchor support with F=EAΔL/L beyond the allowable and leaked the flange, the joint absorbs the elongation;
2) Compute the compensation from ΔL=αLΔT and select the joint: because the compensation must be ≥ the actual elongation to work, the selection is quantified;
3) Lay out the anchor and guide supports properly: because the guides direct the displacement and the anchors take the thrust, the roles are clear;
4) Pre-stretch the expansion joint to offset part of the elongation: because pre-stretch halves the working elongation and lowers the stress, it reduces the load;
5) Install the flanges without additional stress: because the pipe thrust mismatches and leaks the flange, they are fitted stress-free and aligned;
6) Pressure-test hot to check the flange seal: because only the hot state shows the true loading, leak testing is done hot;
7) Verify the support loads: because an overloaded support collapses, the load capacity is checked;
8) Include thermal compensation in the piping design: the original failure to calculate the thermal elongation was the root cause of the thermal growth, so the design must compute it.
GB/T 20801-2020 Pressure piping code