E44-035 · Piping Supports and Thermal Expansion · Large-bore water pipe · ★★
The support spacing of 8m is too large; the pipe sags 25mm at mid-span, the slope reverses and water and air accumulate
[Deflection] Per the simply supported beam f=5qL⁴/384EI, L=8 gives f=25mm, above the allowable.
[Water Accumulation] The reversed slope traps air / water at the low points and blocks the flow.
[Design Omission] The supports were not set for a deflection ≤L/500 and the slope was not controlled — so the sag caused the problem.
1) Densify the supports for a deflection ≤L/500: because for the simply supported beam f=5qL⁴/384EI, L=8 gives f=25mm above the allowable, densifying lowers L and brings the deflection within limits;
2) Hold the design slope to prevent a reversed slope: because a reversed slope traps water and air at the low points and blocks the flow, the downward slope keeps it flowing;
3) Give the large-bore pipe separate guiding and load-bearing supports: because the guides hold position and the load-bearers carry the weight, the roles are divided and the line is held;
4) Add auxiliary supports at mid-span to prevent sag: because the deflection peaks at mid-span, extra support checks it;
5) Take the support spacing from the pipe-diameter code: because the spacing depends on the diameter and excess sags, the code value is used;
6) Provide drain / vent points at the low points: because the low points collect water, there are points to drain;
7) Measure the deflection and slope after installation: because measurement verifies the design, acceptance follows;
8) Include the support spacing in the piping layout: the original failure to size the supports by deflection was the root cause of the sag, so the layout must state it.
GB/T 20801-2020 Pressure piping code