E44-036 · Piping Supports and Thermal Expansion · Pump suction and discharge flanges · ★★★
Pipe weight and thermal expansion overstress the flange nozzle; the coupling is misaligned by 0.15mm and vibration is high
[Nozzle Stress] The piping thrust on the pump nozzle exceeds the 2kN limit of API 685, adding load to the bearings.
[Alignment] The flange mismatch offsets the pump shaft and raises the vibration.
[Design Omission] No piping flexibility analysis was made and no spring supports added — so the overstress caused the vibration.
1) Run a piping flexibility analysis to hold the pump nozzle stress ≤2kN: because the pipe thrust exceeded the 2kN limit of API 685, adding bearing load and a 0.15mm misalignment with high vibration, the flexibility analysis controls the load;
2) Add spring supports at the pump nozzle to unload: because the springs take the pipe weight and thermal expansion and cut the nozzle force, the load is relieved and the nozzle protected;
3) Install the mating flanges stress-free and aligned: because mismatch offsets the pump shaft and raises the vibration, they are fitted stress-free and centered;
4) Keep the pipe weight off the pump body and carry it on supports: because the weight bears on the pump and misaligns it, the supports take the full weight;
5) Re-align at hot state and measure the vibration: because the alignment changes after thermal displacement, it is realigned hot;
6) Add an expansion joint to absorb the thermal displacement: because the joint absorbs the movement and reduces the thrust on the pump, the displacement is taken up and the load reduced;
7) Measure the vibration at trial run ≤2.8mm/s (originally above): because meeting the vibration limit means the alignment is good, acceptance follows;
8) Include the nozzle loads in the piping design: the original absence of a flexibility analysis was the root cause of the overstress, so the design must cover it.
GB/T 50275-2010 Fan, Compressor and Pump Installation Code