E44-084 · Piping Supports and Thermal Expansion · Steam pipe anchor support · ★★★
Thermal displacement ΔL=αLΔT=12e-6×60×200=0.144m pushes the equipment nozzle; the flange leaks and the nozzle deforms
[Thermal Thrust] The weak anchor support lets the thermal expansion push the equipment, loading the nozzle.
[Calculation] ΔL=0.144m makes the nozzle thrust exceed the allowable and the flange leak.
[Design Omission] No expansion joint was provided and the anchor support was weak — so the thermal thrust leaked the flange.
1) Provide a bellows or Π-bend expansion joint to absorb the displacement: because the thermal elongation ΔL=0.144m must be absorbed and the flexible joint takes it up, the equipment nozzle sees no thrust and the flange does not leak;
2) Strengthen the anchor support's load capacity (design it for the thermal thrust): because a weak support passes the thrust to the equipment and a strengthened one carries it, the nozzle is spared;
3) Fit a flexible connection at the equipment nozzle (a metal hose / expansion joint): because the flexible connection absorbs residual displacement and buffers, it further protects the equipment;
4) Verify the thermal displacement and thrust (ΔL=αLΔT and F=EAαΔT): because without verification the thrust cannot be known to exceed the allowable and the check quantifies it, the design is controlled;
5) Set guide supports to control the direction: because without guides the pipe wanders and the guides align the displacement with the joint axis, compensation is effective;
6) Monitor the displacement at hot state (measure the actual ΔL on first heat-up): because the theoretical ΔL may differ from the actual and monitoring verifies it, no thrust on the equipment is confirmed;
7) Verify at trial run that no thrust reaches the equipment (no nozzle deformation or leak): because the thermal thrust is the result and must be measured hot, acceptance follows;
8) Make thermal compensation a mandatory item in the piping design: the original absence of an expansion joint caused the thermal thrust leak, so compensation is provided at the design stage.
GB/T 20801-2020 Pressure piping code