Frost Heave Under an Insulated Support Pier Lifting the Pipe Off Its Support

E44-137 · Piping Supports and Thermal Expansion · Liquid-ammonia cryogenic pipe (-33℃) · ★★★

Problem Description

The support pier under the insulation frost-heaved and rose 15mm; the pipe came off the support and hung free, and the flange mismatched and leaked

Root Cause

[Frost Heave] Frost forms where the insulation is damaged, and the ground water frost-heaves by Δh=15mm.
[Support Separation] The lift leaves the pipe off the support and hanging free.
[Design Omission] No thermal-break pad was used and no protection against water ingress into the insulation — causing the frost heave.

Corrective Solution

1) Add a thermal-break pad under the insulation to stop the cold bridge: because the cold bridge frost-heaved the pier up 15mm, the pad breaks the bridge;
2) Fit the insulation with a waterproof jacket against water ingress: because water ingress frost-heaves, the jacket sheds water;
3) Treat the pier foundation against frost heave: because the ground water frost-heaves, the foundation resists it;
4) Provide the support with an adjustable elevation to compensate the lift: because the lift causes separation, it can be reset;
5) Inspect and repair the insulation periodically: because damage makes a cold bridge, it is checked regularly;
6) Add anti-slip stops under the pipe: because a hanging pipe slides easily, the stops lock it;
7) Measure at cold trial run that the support is in contact with no gap: because the design requires measurement, delivery is confirmed;
8) Include insulation waterproofing in operations: the original water ingress was the root cause of the frost heave, so operations must cover it.

Checklist

Reference

GB/T 20801-2020 Pressure piping code