E44-796 · Piping Supports and Thermal Expansion · Hanger · ★★
Tie rod bent, load lost, pipe sagging
[Mechanism] A thin tie rod / eccentric pull bends it and loses the load.
[Calculation] The bent tie rod drops the load capacity >30% and sags the pipe.
[Design Omission] Neither a thicker rod was selected nor the straightness checked — so it must be selected.
1) Use a thicker tie rod (select a diameter ≥ the calculated one per the load, safety factor 2): because the original thin rod bent, dropped the load capacity >30% and sagged the pipe, a thicker rod carries the pull;
2) Check the tie-rod straightness (straightness ≤1/500, prevent eccentric pull): because bending loses the load and the check straightens it, the rod is straightened;
3) Select the rod for the load (working load ≤70% of rated): because too small bends and a suitable selection is adequate, the load rating is selected;
4) Prevent eccentric pull (hoist concentrically, deviation ≤2mm): because eccentricity bends and centering stabilizes it, eccentric pull is prevented;
5) Monitor the bending condition (visual check / straightness measurement, alarm at bend >2mm): because progressive bending enlarges the sag and early awareness helps, bending is monitored;
6) Perform a load test (load it and record the tie-rod force): because the original lack of testing left the bending undiscovered, the test identifies the load points, so the load is tested;
7) Keep the pipe weight stable (distribute evenly between supports to cut the per-rod load): because a changing duty bends and even distribution stabilizes it, the weight is stabilized;
8) Write the thicker rod and straightening into the assembly card: the original lack of selection was the root cause of the bending, so assembly controls the work and the tie rod is straight.
GB/T 17116.1-2018 Pipe supports and hangers