E44-840 · Piping Supports and Thermal Expansion · DN800 Steam-Pipe Bellows Expansion Joint · ★★★
The design compensation was ±50mm but the measured thermal displacement was 85mm; the expansion joint was torn open and leaked
[Mechanism] Thermal expansion of the piping drives the axial displacement of the expansion joint beyond its rated compensation; the bellows is over-stretched beyond the allowable stress and cracks, while mispositioned guide supports worsen the off-center wear.
[Calculation] Thermal elongation ΔL=α·L·ΔT=1.2×10⁻⁵×120m×180℃=259mm; at 50mm per unit, 5.2 units are needed, but only 3 were installed, so each unit sees 85mm against a 50mm rating; the bellows stress σ=E·Δ/L> the allowable.
[Design Omission] The total thermal displacement was never calculated, the number of compensation units was never checked, and the guide spacing was too large with no restraint.
1) Increase the number of compensation units (6 units × 50mm for a total thermal elongation of 259mm, leaving margin): because the original 3 units left each seeing 85mm over the 50mm rating and tore, adequate compensation is provided;
2) Check the compensation capacity (selected capacity ≥1.2× the actual movement, i.e. ≥102mm): because too small a capacity is exceeded, checking makes it sufficient;
3) Add guides and restraints (double guides within 4D of the joint, limiting offset ≤3mm): because offset wears and cracks the bellows, guides correct it;
4) Provide limit rods (limit the travel to 55mm against over-extension): because severe extension cracks it, the limit protects it;
5) Monitor displacement (measure the axial travel with a displacement gauge, alarm >45mm): because gradual overload brings cracking closer, early awareness helps;
6) Run a displacement test (record the displacement curve during heat-up): because the original lack of testing hid the overload, the test reveals the displacement;
7) Control the temperature ramp (heat up ≤50℃/h for gradual expansion): because a fast ramp over-displaces, a slow one controls it;
8) Write the number of units and the guide restraints into the specification: the original design omission of the calculation was the root cause of the overload, so fixing it closes the loop;
GB/T 12777-2019 Metal bellows expansion joints