E44-886 · Throttling Noise and Vibration · Throttling element · ★★★
The anti-cavitation valve failed; σ=0.2, pit depth 3mm and noise 90dB(A)
[Mechanism] The anti-cavitation trim is worn or wrongly selected, so σ stays <1.0 and cavitation continues.
[Calculation] σ=0.2<1.0; collapse pitting is 3mm deep.
[Design Omission] No back-pressure increase, no σ verification, no trim change.
1) Raise the back pressure to prevent cavitation (raise p2 downstream so σ≥1.3), since the original σ0.2 defeated the anti-cavitation trim and pitted 3mm, thus raising the pressure prevents pitting;
2) Verify σ (margin ≥1.3), since low pressure pits and verification avoids it, thus checking σ;
3) Switch to anti-cavitation trim (reselect tungsten carbide trim), since the original failed and replacement resists, thus replacing the trim;
4) Split into multiple stages (3 stages), since concentration pits and splitting eases it, thus staging;
5) Monitor pitting (thickness gauge, alarm >1mm), since growing pitting approaches breakthrough, thus early detection;
6) Run a cavitation test (lower the pressure, measure the critical σ), since the lack of testing left pitting undetected and the test reveals the critical value, thus testing cavitation;
7) Control the pressure drop by splitting it (single stage Δp≤0.3MPa), since concentration pits and splitting eases it, thus controlling the drop;
8) Write back-pressure increase and σ verification into the calculation sheet, since the original lack of increase is the root cause of pitting and locking it in closes the loop, thus controlling it in the calculation.
GB/T 17213.1-2015 Industrial-process control valves