Knowledge Base › Fluid Systems Error Case › Drain Pipe Water Seal Drying Out Causing Odor Return

Drain Pipe Water Seal Drying Out Causing Odor Return

E44-094 · Siphon and Backflow · Workshop Drainage System · ★★

Problem Description

The dried-out water seal lets sewer odor return into the workshop, causing complaints about H2S odor

Root Cause

[Seal Loss] Evaporation or siphon drainage of the water seal makes the isolation fail.
[Calculation] A water-seal depth <50 mm is easily drained, losing the isolation.
[Design Omission] No make-up water and no isolation, so odor returned.

Corrective Solution

1) Use a water-seal depth ≥50 mm, because a depth <50 mm is easily drained by siphon or evaporation and loses the isolation, thereby sufficient depth gives stable isolation and no odor return;
2) Use automatic make-up water to prevent dry-out (a make-up valve or overflow make-up), because evaporation/drainage loses the water seal and automatic make-up maintains the level, thereby no dry-out;
3) Provide anti-siphon measures (a trap or anti-siphon fittings), because the drainage siphon drains the water seal and anti-siphon measures retain the water, thereby lasting isolation;
4) Run the vent pipe independently through the roof, because the vent pipe balances the pressure in the pipe and prevents negative pressure from draining the water seal, thereby stabilizing the water seal;
5) Periodically check the water level (inspect the water-seal depth), because dry-out progresses gradually and periodic checks prevent it, thereby early make-up;
6) Install activated-carbon adsorption at odor points, because any returned odor can have its H2S adsorbed and complaints reduced, thereby environmentally friendly;
7) Commission and verify there is no odor return (water-tightness test and odor sampling), because odor return is the outcome and measurement is needed, thereby acceptance;
8) Make the water seal a mandatory item in the drainage design, because the original lack of make-up/isolation caused odor return, thereby providing the water seal already at the design stage.

Checklist

Reference

GB/T 50015-2019 Code for Design of Building Water Supply and Drainage

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL