Knowledge Base › Fluid Systems Error Case › Pump-Stop Backflow of the Cooling Tower Make-Up Pipe Flooding the Pump Room

Pump-Stop Backflow of the Cooling Tower Make-Up Pipe Flooding the Pump Room

E44-141 · Siphon and Backflow · Cooling Tower Make-Up Pipe · ★★

Problem Description

The check valve fails and lets water flow back after the pump stops; cooling-tower water backflows and floods the pump house, soaking the motor

Root Cause

[Backflow] The 5 m elevation difference H=5 m between the elevated tower and the pump house produces a backflow Q=A√(2gH).
[Flooding] The backflow keeps filling the pump room.
[Design Omission] No dual check valves and no siphon break, so backflow caused flooding.

Corrective Solution

1) Install dual check valves and test them periodically, because a single-valve failure causes backflow that floods the pump room, thereby dual-valve redundancy;
2) Install a slow-closing check valve at the pump outlet to prevent backflow, because the instantaneous backflow on pump stop is strong, thereby slow closing cuts off the flow;
3) Install a vacuum breaker at the high point to break the siphon, because the siphon continues the backflow, thereby breaking the vacuum to stop the flow;
4) Provide floor drains and a drainage trench in the pump room to prevent flooding, because if backflow occurs there is a drain, thereby drainage as a fallback;
5) Provide a low-level alarm and limit on the make-up pipe, because backflow makes the water level abnormal, thereby early alarm;
6) Install isolation valves before and after the check valve for replacement, because a failed valve can be isolated, thereby making repair possible;
7) Commission and verify there is no backflow on pump stop, because the design requires measurement, thereby confirming at delivery;
8) Include backflow prevention in the make-up design, because the original single valve is the root cause of backflow, thereby the design must include it.

Checklist

Reference

GB/T 20801-2020 Pressure piping code