Knowledge Base › Fluid Systems Error Case › Unventable Air Accumulation in a Siphon Pipe

Unventable Air Accumulation in a Siphon Pipe

E44-922 · Siphon and Backflow · Siphon Pipe · ★★

Problem Description

Air accumulation, cannot be vented, flow stoppage

Root Cause

[Mechanism] The pipe has a reversed slope, no venting at the high point, and a local dip in the pipe top, so air accumulates, cannot be vented, and the flow stops.
[Calculation] The adverse-slope section is 3 m long and the dip traps 0.6 L of air, raising the resistance 2.5 times and dropping the flow 35% until it stops.
[Design Omission] No favorable slope, no venting, and no removal of the dip.

Corrective Solution

1) Change to a favorable slope i≥0.003 (originally an adverse slope with a dip that trapped air), because a favorable slope carries the air out with the flow and eliminates the dip, thereby venting the air and restoring passage;
2) Install an automatic vent valve at the high point (venting on air accumulation), because the dip traps air and restricts flow and venting restores it, thereby removing the air;
3) Raise and blend the local dip smoothly (remove the dip), because the dip is the source of the air pocket and removing it leaves nowhere for air to collect, thereby smoothing the pipe top;
4) Raise the flow velocity to 1.3 m/s (originally 0.9 m/s), because air tends to stagnate at low velocity and a higher velocity carries it out, thereby suppressing accumulation;
5) Provide a sight glass and a manual vent at the high point (as backup), because automatic failure requires a manual alternative as double insurance, thereby venting without relying on a single point;
6) Perform an air-accumulation test (fill with water and verify it is fully vented), because the design omitted the slope and the test confirms the air is cleared, thereby verifying the venting;
7) Monitor the flow in operation (alarm if it drops >20%), because air accumulation first shows as a flow drop before stoppage, thereby monitoring the flow for early warning;
8) Write the favorable slope and venting into the installation card, because the root cause of air accumulation is an adverse slope without venting, so installation must govern to prevent flow stoppage.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping