Knowledge Base › Fluid Systems Error Case › Local Elevation of a Siphon Pipe Causing an Air Blockage

Local Elevation of a Siphon Pipe Causing an Air Blockage

E44-929 · Siphon and Backflow · Siphon Pipe · ★★

Problem Description

Elevation, air blockage, flow stoppage

Root Cause

[Mechanism] A local high point in the piping makes the air stagnate into a block and stops the flow.
[Calculation] The high point rises 0.5 m above the pipe top and traps 0.4 L of air, cutting the flow area by 60% and stopping the flow.
[Design Omission] No favorable slope, no removal of the high point, and no venting.

Corrective Solution

1) Change the local high point to a smooth transition (remove the hump, i≥0.003), because the high point is the source of the air pocket and removing it leaves nowhere for air to collect, thereby smoothing the pipe top;
2) Install an automatic vent valve at the high point (venting on air accumulation), because the high point traps air and restricts flow and venting restores it, thereby eliminating the block;
3) Change to a favorable slope so air drains with the flow (originally an adverse slope trapped it), because a favorable slope vents while an adverse slope traps, thereby suppressing the air;
4) Raise the flow velocity to 1.3 m/s (originally 0.9 m/s), because air tends to stagnate at low velocity and a higher velocity carries it out, thereby suppressing accumulation;
5) Provide a sight glass and a manual vent at the high point (as backup), because automatic failure requires a manual alternative as double insurance, thereby venting without relying on a single point;
6) Perform an air-blockage test (fill with water and verify no air pocket), because the design omitted the slope and the test confirms the air is cleared, thereby verifying the venting;
7) Monitor the flow in operation (alarm if it drops >20%), because the air blockage first shows as a flow drop before stoppage, thereby monitoring the flow for early warning;
8) Write the removal of the high point and the venting into the installation card, because the root cause of the air blockage is an unremoved high point, so installation must govern to prevent flow stoppage.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping