Inductive-Load Turn-Off Spike Breaking Down the Power Module

E45-135 · Power Supply · 24V Switching Supply Module · ★★

Problem Description

When contactors or relays in the distribution cabinet de-energize, nearby 24V switching supply modules break down repeatedly — 4 failed in 3 months

Root Cause

[Mechanism] The abrupt current change when an inductive load (relay coil, contactor coil) turns off produces a back-EMF spike (L·di/dt) that travels along the shared 24V bus and adds to the power module output, breaking down its rectifiers.
[Calculation] With a coil L=2H and a turn-off di/dt≈100A/s, the induced back-spike V=L·di/dt≈200V, whose amplitude exceeds the module's withstand voltage → breakdown; an RC snubber in parallel holds the spike to <60V.
[Design Omission] The inductive loads had no RC snubber or freewheeling diode, they shared a bus with the instrument supply, and no overvoltage clamp was fitted.

Corrective Solution

① RC snubber across inductive loads: 100Ω + 0.1μF across each coil → absorbs the back-spike to <60V, and the modules stop breaking down
② Freewheeling diode for DC coils: connect a diode in reverse parallel → suppresses the back-EMF
③ TVS clamp at the supply: put a TVS across the bus (clamping at 30V) → overvoltage is clamped, no breakdown
④ Separate bus for the instrument supply: feed the sensors and the relays from different buses → spikes do not couple across
⑤ Overvoltage protection in the module: choose a supply with OVP → it latches off on overvoltage
⑥ Surge test: inject a back-spike and verify the module survives → confirmed by measurement
⑦ Separate routing: keep inductive-load wiring ≥100mm from the supply module → less coupling
⑧ Make the RC snubber a mandatory item on the control drawing → gate at the source

Checklist

Reference

GB/T 17626.4-2018