E45-223 · Grounding and Shielding · Motorised Equipment Enclosure · ★★★
Insulation ageing left the enclosure live; with no insulation monitoring there was no alarm, and the risk of electric shock was high
[Mechanism] Degraded winding insulation couples the phase conductor to the enclosure through a leakage resistance; if PE is missing or poorly bonded the enclosure becomes live, and without insulation monitoring the leakage current can reach a dangerous level unnoticed.
[Calculation] With insulation resistance falling from ∞ to 50kΩ at a 220V phase voltage, the leakage current I=4.4mA exceeds the safe perception threshold; with no alarm the enclosure stays live for a long time.
[Design Omission] The equipment had no insulation monitoring, PE was poorly bonded, and insulation was not measured periodically.
① Insulation monitoring: fit a monitor to measure leakage current in real time → alarms when over limit
② Reliable PE: crimp the enclosure PE bond reliably (torque ≥2.5N·m) → trips on fault
③ RCD: fit a 30mA residual-current device on the supply circuit → rapid disconnection on shock
④ Periodic insulation test: measure winding insulation quarterly, >1MΩ → find ageing early
⑤ Alarm interlock: interlock the insulation alarm to shut the machine down → prevents shock
⑥ Bond test: enclosure-to-PE resistance <0.1Ω → continuity confirmed
⑦ Leakage test: measure leakage current <3.5mA → safe
⑧ Write insulation monitoring into the safety specification → control at the source
GB/T 25295-2010 Guidelines for safety design of electrical equipment