E45-259 · Wiring and Terminals · Critical Measuring Point · ★
The terminal feeding a critical sensor came loose from a single-terminal supply; line monitoring was interrupted for 4 hours
[Mechanism] The critical measuring point used a single terminal and a single supply with no redundancy; any terminal failure de-energized the whole point, and with no backup channel the system had a monitoring blind spot.
[Calculation] If a single point has a 5-year MTBF, without redundancy the availability is 99.98%; dual redundancy raises it to 99.9999%, two orders of magnitude better.
[Design Omission] No redundancy for the critical point, no dual supply, and no failover.
① Dual redundancy: supply critical points from two paths → no blind spot
② Dual supply: switch between two independent sources → no interruption
③ Switchover logic: fail over to the backup automatically → seamless
④ Deviation comparison: alarm when the two signals differ by >5% → self-check
⑤ Availability check: size the redundancy to the required availability → sufficient
⑥ Loss-of-supply alarm: alarm immediately on power loss → early warning
⑦ Load test: break one supply to verify switchover → confirmation
⑧ Write the redundancy strategy into the safety case → control at the source
GB/T 25295-2010 Guidelines for safety design of electrical equipment