E45-260 · Wiring and Terminals · Three-Phase Current · ★
The three-phase CT wiring was not phase-marked; the power-factor reading became abnormal
[Mechanism] The three-phase CT wiring was not marked A/B/C, so after restoration or modification the phase sequence got mixed up; the voltage and current used in the power calculation came from different phases and the power factor went negative or abnormal.
[Calculation] A phase-sequence error mis-computes the current lag angle by 120°; the power factor reads -0.3 instead of 0.9 and the energy metering runs backwards.
[Design Omission] No phase marking, no phase-sequence verification, and an unclear drawing.
① Phase marking: mark each phase with A/B/C colors → no confusion
② Phase-sequence meter: measure the sequence after wiring → correct
③ Drawing check: wire the phases per the drawing → accurate
④ Power verification: the power-factor reading must be plausible → confirmation
⑤ Clear labels: label the terminals with phase names → prevent error
⑥ Two-person check: have two people check critical phases → no mistakes
⑦ Trial run: run under load and check the power → calibrate
⑧ Write the phase-sequence rules into the drawing → control at the source
GB/T 20840.2-2014 Instrument transformers - Part 2: Additional requirements for current transformers