E45-297 · Calibration and Adjustment · Differential Pressure Transmitter · ★
The full-scale point is calibrated before the zero; the zero drift is not eliminated and the reading is off by 1%FS
[Mechanism] Calibration should go zero first and full scale second; if full scale comes first, adjusting the zero later shifts the coefficients already written at the full-scale point, so the earlier full-scale reference becomes inaccurate.
[Calculation] Setting the slope at full scale first and then adjusting the zero shifts the zero by 1%FS, and the already-set full-scale point is not corrected in step.
[Design Omission] The zero-then-full-scale sequence was not specified and the full-scale point was not recalibrated.
① Fix the sequence: zero first, then full scale → correct reference
② Full-scale recalibration: recheck the full-scale point after zeroing → verify the slope
③ Procedure: write the calibration sequence → prevent errors
④ Verification: compare two points after calibration → accurate throughout
⑤ Out-of-tolerance alarm: warn when the deviation >1% → early warning
⑥ Records: keep the sequence on file → traceability
⑦ Periodic calibration: calibrate every quarter → prevent drift
⑧ Write the sequence requirement into the procedure → control at the source
JJG 882-2019 Verification Regulation of Pressure Transmitters