E46-443 · Commissioning & Run-In · Hydraulic system · ★★
The new system was put into service without circulating flushing, so welding slag from the piping entered the valve spools, causing sticking and loss of directional control.
[Mechanism] Impurities left in the piping enter the valves with the oil, jamming the spools and blocking operation.
[Calculation] Once particulates exceed NAS class 9 the valves jam and the system loses control.
[Design gap] No circulating flush of the piping was performed.
① Flush first: connect an external flushing circuit and circulate until cleanliness meets the target
② Filter: circulate the oil through a fine filter cart
③ Sample: take an oil sample at the end of flushing to check the NAS class, and install the valves only once it passes
④ Bypass: bypass the valve positions during flushing to prevent jamming
⑤ Oil check: check the oil cleanliness before filling
⑥ Record: record the flushing duration and cleanliness class
⑦ Quality verification: confirm acceptance by oil cleanliness, confirmed by data
⑧ Standardize process: write the flushing procedure into hydraulic commissioning, controlling at the source
GB/T 3766-2015 General technical conditions for hydraulic systems