E46-449 · Commissioning & Run-In · Newly Built Unit · ★★
The run-in process data was handed over only verbally and never archived; when an abnormality appeared after production started, the initial state could not be compared and the response was blind.
[Mechanism] Without archives there is no baseline for trend comparison, making problem attribution difficult.
[Calculation] Without initial values the degradation rate cannot be computed and early warning fails.
[Design gap] The run-in data was not included in the handover documents.
① Collect all: collect vibration, temperature, pressure and current at every run-in stage
② Archive: compile the data into the handover documents in duplicate
③ Mark baseline: clearly mark the initial baseline values
④ Sign-off: the commissioning and acceptance parties both sign to confirm
⑤ Handover: transfer the documents to operations and maintenance together with the equipment
⑥ Traceability: operations and maintenance compare trends against the archives
⑦ Quality verification: confirm traceability by complete archives, confirmed by data
⑧ Standardize process: write data archiving into the handover specification, controlling at the source
GB/T 6075.1-2012 Mechanical vibration - Measurement and evaluation of machine vibration on non-rotating parts