Knowledge Base › Lithium-Battery Equipment › 2026-10-10_08_Lithium-Battery Electrolyte Metering Pump Sizing Calculation_BST

Lithium-battery electrolyte metering pump sizing example: displacement + accuracy + cycle time right in one pass

Summary

For the electrolyte filling process of prismatic aluminum-shell cells, this article gives a complete worked example in four steps: "convert the fill quantity to volume → derive the flow rate from the cycle time → match pump displacement to the stroke rate → check accuracy". Readers can apply the formulas directly to select a ceramic-plunger metering pump and avoid common pitfalls such as back pressure and leakage.

Body

Application Scenario and Problem Background

Electrolyte filling is the key process that determines consistency in lithium-battery manufacturing: too large a deviation in the injected amount directly lowers cell capacity or makes cycle life plunge. The fill quantity per cell is usually 20~80 mL for prismatic aluminum-shell cells, 5~30 mL for pouch cells, and only 2~5 mL for cylindrical cells. Two kinds of mistakes are common in engineering: first, selecting the pump only by "how many milliliters per minute are needed" without checking the number of strokes and the accuracy within a single fill time, so the cycle gets faster but the fill accuracy falls to worse than ±2%; second, ignoring the piping back pressure and the valve response lag, so the pump outlet displacement does not match the actual liquid delivered at the valve port and the tolerance is exceeded.

On lithium-battery filling lines there are mainly two kinds of metering pump: ceramic-plunger and PTFE-diaphragm. The plunger type is rigid with repeatability down to ±0.3%, but plunger seal wear needs attention; the diaphragm type avoids oil contamination and resists corrosion well, but its absolute displacement is smaller and its accuracy slightly lower. For large fill volumes in prismatic aluminum shells, the plunger type is the first choice.

Selection Calculation

Core Formulas

Electrolyte volume:V = m / ρ, where m is the fill mass per cell (g) and ρ the electrolyte density (g/mL).

Required average flow rate:Q = V / t_inj, where t_inj is the effective fill time per cell (s). Convert to mL/min: Q = V(mL) / t_inj(s) × 60.

Pump displacement per stroke:V_s = (π/4) · d² · S, where d is the plunger diameter (mm) and S the plunger stroke (mm).

Strokes per minute:n = Q / V_s。

Average plunger speed:v = 2 · S · n / 60, in m/s; for a ceramic plunger v≤0.3 m/s is recommended.

Fill accuracy check: error per cell = pump repeatability (FS) × V, required ≤±1% × V.

Parameter description

ParameterMeaningUnit
mFill mass per cellg
ρElectrolyte density (commonly 1.20~1.25 for LiPF6 systems)g/mL
VFill volume per cellmL
t_injEffective fill time per cells
QRequired average flow ratemL/min
V_sPump displacement per strokemL
dPlunger diametermm
SPlunger strokemm
nStroke ratecycles/min
vAverage plunger speedm/s

Recommended Value Table

ItemRecommended valueNotes
Fill accuracy requirement±0.5%~±1%±1% for power cells, ±0.5% for consumer electronics
Electrolyte density ρ1.20~1.25 g/mLUse the measured value from the supplier's COA
Plunger pump repeatability±0.2%~±0.5% FSA servo-driven ceramic plunger can reach ±0.3%
Average plunger speed v≤0.3 m/sHigh speed reduces accuracy and accelerates seal wear
Stroke rate n30~120 strokes/minToo low gives large discharge pulsation, too high shortens life
Piping back pressure≤0.3 MPaBack-pressure fluctuation translates directly into fill-quantity deviation

Complete Worked Example

Given:For a prismatic aluminum-shell 50 Ah cell, the fill mass per cell is m=48 g, the electrolyte density ρ=1.20 g/mL, the filling cycle T=8 s per cell, of which the fill valve is open and actually delivering liquid for t_inj=4 s, and the fill accuracy requirement is ±1%.

Step 1: convert the fill volume per cell.

V = 48 / 1.20 = 40.0 mL。

Step 2: find the required average flow rate.

Q = V / t_inj = 40.0 / 4 = 10.0 mL/s = 600 mL/min。

Step 3: make a first selection of the pump displacement per stroke.

Taking the stroke rate n near 60 strokes/min (1 per second, for easy matching with the cam/servo cycle), try V_s=10 mL. This corresponds to a plunger diameter d=12 mm and stroke S=88 mm; check:

V_s = (π/4) × 12² × 88 = 9953 mm³ ≈ 9.95 mL。

Step 4: check the stroke rate and the plunger speed.

n = 600 / 9.95 = 60.3 strokes/min, within the recommended range of 30~120.

Average plunger speed v = 2 × 0.088 × 60.3 / 60 = 0.177 m/s, far below the 0.3 m/s limit.

Step 5: fill accuracy check.

Strokes within 4 s = 60.3 × 4 / 60 = 4.02 strokes; actual discharge = 4.02 × 9.95 = 40.0 mL.

Taking the pump repeatability as ±0.3% FS, the fill error per cell = ±0.3% × 40 = ±0.12 mL, relative error = 0.12/40 = ±0.3%, less than the ±1% requirement.

Conclusion:Select a ceramic-plunger metering pump with a plunger diameter of 12 mm, a stroke of 88 mm, a displacement per stroke of about 9.95 mL, and a servo-driven stroke rate of 60 strokes/min; it meets the filling requirement of 40 mL per cell, an 8 s cycle, and ±1% accuracy.

Result Verification and Pitfall Reminders

  1. Piping back pressure must be measured.The electrolyte travels from the pump outlet through the filter, valve, and hose to the fill head; for every 0.1 MPa of back-pressure fluctuation the actual plunger-pump displacement can change by 0.3%~0.5%. Add a pressure gauge at the pump outlet, measure the back pressure during commissioning, and write the compensation parameters into the servo program — do not rely only on the rated displacement in the pump catalog.
  2. Valve response lag takes up cycle time.Opening a solenoid valve to steady delivery lags by 10~30 ms, and closing lags too. In the example, t_inj=4 s is the net delivery time; when programming, the valve lead and lag must be compensated for, otherwise the actual fill time is eaten away, and a shortage of displacement is made up by raising the stroke rate — which in fact lowers accuracy.
  3. Leak prevention and zero-point check.The electrolyte decomposes on contact with water, releasing hydrogen and corroding circuit boards, so the pump and piping joints must use VCR or metal-face seals — ordinary quick-connect fittings are forbidden. At the start of each shift, run 3 dry fills and weigh them to confirm zero-point repeatability within ±0.05 g; re-check once after 4 hours of continuous production to prevent drift from plunger seal wear.

Suggested Illustrations

If you have no idea for the structure, browse the full-line 3D models (sorting machines, feeders, etc., with parts lists) in the "MOULDL Model Library (mouldl Model Library)"; for data, check them again against the "BST Technical Handbook" to be safer.

This article was compiled by Baist Technology (BST) as a reference for mechanical selection.