1. Datum first
Machine the locating datum surfaces first
The following operations are located by that datum
Example: on a casting, machine the bottom face / the dowel hole first
2. Roughing before finishing
Roughing → semi-finishing → finishing → precision machining
The accuracy increases step by step
3. Main surfaces before secondary ones
The main surfaces (assembly / working faces) are machined first
The secondary surfaces (threaded holes / oil holes) are machined later
4. Faces before holes
Machine the faces first and use them as the datum for the holes
Example: on a casting, mill the bottom face first and then bore the holes
5. Arranging the heat treatment operations
Annealing / normalizing: after the blank, before roughing
Quench and temper: after roughing, before semi-finishing
Quenching: after semi-finishing, before grinding
Ageing: after roughing (stress relief)
Surface treatment: after finishing
6. Inspection operations
After the critical operations
Before and after heat treatment
Final inspection of the finished part
C45 steel stepped shaft:
1. Cutting off (sawing)
2. Forging (die forging / free forging)
3. Normalizing (the blank)
4. Milling the face and drilling the center hole
5. Rough turning all the diameters
6. Quench and temper (HB 220~250)
7. Repairing the center holes
8. Semi-finish turning all the diameters (leaving the grinding allowance)
9. Turning the threads / milling the keyways
10. Quenching (where surface hardening is needed)
11. Rough grinding the diameters
12. Finish grinding the diameters
13. Inspection
C45 steel gear blank:
1. Cutting off
2. Forging
3. Normalizing
4. Rough turning the face and the diameter
5. Finish turning the face and the diameter (leaving the grinding allowance)
6. Drilling, reaming and honing the center hole
7. Rough and finish turning the other face
8. Boring the internal bore
9. Broaching / pulling the keyway
10. Quenching
11. Grinding the face
12. Grinding the bore
13. Inspection
HT250 gearbox housing:
1. Casting
2. Ageing (artificial / natural)
3. Rough milling the top face
4. Rough boring all the holes
5. Ageing (relief of the roughing stresses)
6. Finish milling the bottom / top / side faces
7. Rough boring / semi-finish boring all the hole systems
8. Drilling the thread tapping holes and the oil holes
9. Tapping the threads
10. Finish boring the main bearing bores
11. Honing the main bearing bores
12. Inspection
Concentrated (few operations, more content in each):
Advantages: fewer setups, higher accuracy, fewer machines
Disadvantages: the equipment is complex and the setup is difficult
Suited to: CNC / machining centers
Dispersed (many operations, less content in each):
Advantages: simple equipment, easy to set up
Disadvantages: many setups, accumulated error
Suited to: production lines / large batches
1. Operation number
2. Operation name
3. Machine
4. Fixture
5. Tooling
6. Measuring equipment
7. Cutting parameters
8. Labour time
1. Improve the machinability
2. Improve the mechanical properties
3. Eliminate the internal stresses
4. Surface strengthening
1. Preliminary heat treatment (improve the machinability)
Annealing / normalizing — after the blank, before roughing
Purposes:
① Soften the blank (easier cutting)
② Eliminate the casting / forging stresses
③ Refine the grain
④ Prepare for the final heat treatment
Typical:
Castings: annealing (removes the white structure and the stresses)
Forgings: normalizing (refines and softens)
High carbon steel: spheroidising anneal (lowers the hardness for cutting)
Alloy steel: isothermal annealing (homogenises the structure)
2. Intermediate heat treatment (improve the final properties)
Quench and temper — after roughing, before semi-finishing
Purposes:
① Improve the comprehensive mechanical properties (strength + toughness)
② Prepare for surface hardening
③ Eliminate the roughing stresses
Typical:
C45 steel: 840℃ quenching + 550℃ tempering
40Cr: 850℃ quenching + 550℃ tempering
Reaches HB 220~280
3. Stress relief treatment
Ageing — after roughing / before finishing
Artificial ageing: 500~600℃×4~8h, furnace cooling
Vibration ageing: an exciter vibrates it for 15~30min
Natural ageing: left for several months to several years
Applicable:
Castings (high as-cast stress)
Welded parts
Precision parts (removal of the machining stress)
Large parts (avoids machining deformation)
4. Final heat treatment (raise the hardness / strength)
Quenching + tempering — after semi-finishing, before grinding
Purposes:
① Increase the hardness and the wear resistance
② Work with grinding to reach the final accuracy
Typical:
C45 steel: 840℃ quenching + 200℃ tempering (HRC 50~55)
40Cr: 850℃ quenching + 200℃ tempering (HRC 50~55)
GCr15: 830℃ quenching + 160℃ tempering (HRC 60~64)
Leave a grinding allowance of 0.2~0.5mm (compensating for the quenching deformation)
5. Surface heat treatment
Induction hardening / carburising / nitriding — before or after finishing
Induction hardening: after finish turning, before grinding
Small deformation (0.05~0.2mm), a small grinding allowance
Carburising and quenching: after semi-finishing, before grinding
Large deformation (0.1~0.5mm), a large grinding allowance
Carburised layer 0.5~1.5mm
Nitriding: after finishing
Extremely small deformation (<0.02mm)
No further grinding is needed
A thin layer (0.3~0.6mm)
Suited to high accuracy parts
6. Surface treatment
Blackening / zinc plating / chrome plating / anodising — after finishing
Blackening: rust prevention, does not affect the dimensions
Zinc plating: rust prevention, coating 5~15μm
Hard chrome: wear resistance, coating 10~100μm (consider the dimensions)
Anodising: aluminium parts, decorative + wear resistant
C45 steel quenched and tempered shaft (comprehensive mechanical properties):
1. Cutting off
2. Forging
3. Normalizing
4. Rough turning
5. Quench and temper (HB 220~250)
6. Semi-finish turning
7. Finish turning
8. Inspection
20CrMnTi carburised gear (hard surface and tough core):
1. Cutting off
2. Forging
3. Normalizing
4. Rough turning / semi-finish turning
5. Gear cutting (leaving the grinding allowance)
6. Carburising (900~950℃)
7. Quenching + low temperature tempering (HRC 58~62)
8. Gear grinding
9. Inspection
38CrMoAl nitrided spindle (ultra precision):
1. Cutting off
2. Forging
3. Annealing
4. Rough turning
5. Quench and temper (HB 250~280)
6. Semi-finish turning
7. Stress relief ageing
8. Finish turning (leaving the grinding allowance)
9. Rough grinding
10. Nitriding (HV 900~1100)
11. Finish grinding / super finish grinding
12. Inspection
Similar parts are classified into groups
The process is formulated per group
Improves efficiency / standardisation
1. Opitz system (Germany)
9 digits
1~5: shape features
6~9: auxiliary features
2. JLBM-1 (Chinese mechanical parts)
15 digits
1~2: name category
3~9: shape features
10~15: auxiliary (material / heat treatment / accuracy)
3. KK system (Japan)
13 digits
By shape:
Revolved parts (shafts / discs / sleeves)
Non-revolved parts (plates / blocks / housings)
Special parts
By complexity:
Simple (the basic shape)
Medium (one main feature)
Complex (several features)
1. Code and classify
All the parts are coded and then classified
2. Design the composite part
It contains the features of all the parts in the group
The composite part is virtual (it does not actually exist)
3. Formulate the group process
Design the process route around the composite part
Each part selects the operations it needs
4. Organise the production cell
Organise the equipment by part family
A group technology cell (GT Cell)
1. Reduces the process design time (typical processes)
2. Improves the equipment utilisation
3. Simplifies the production management
4. Suited to multi-variety small and medium batches
1. Typical process
A standard process for a class of parts
For example: the typical shaft process / the typical housing process
2. Standard operation
Standardised operations that are used repeatedly
For example: center hole machining / external grinding
3. Process database
Stores the processes / tooling / fixtures / parameters
Easy to retrieve and reuse
1. Variant approach
Based on group technology
Retrieves a similar process and modifies it
2. Generative approach
Based on a process knowledge base
Generates the process automatically
3. Hybrid approach
A combination of variant and generative
The mainstream today
1. Shortens the process design time by 50~80%
2. Process consistency
3. Process optimisation (knowledge base)
4. Integration with ERP/MES
5. Accumulation of process knowledge
Large batch: CAPP generates a typical process that is then used in bulk
Multi-variety small batch: CAPP generates new processes quickly
New employees: CAPP serves as the process guidance