Machining Processes · Quality Control (Quick Reference)

Machining Accuracy and Surface Quality Inspection

【Classification of Accuracy Inspection】

1. Dimensional accuracy

- Length / diameter / angle

- Measuring equipment: micrometer / caliper / comparator

2. Form and position accuracy

- Straightness / flatness / roundness / cylindricity

- Parallelism / perpendicularity / coaxiality / position

- Measuring equipment: dial indicator / level / CMM

3. Surface quality

- Roughness (Ra/Rz)

- Waviness

- Surface defects (cracks / burns)

- Measuring equipment: roughness tester / optical instrument

【Dimensional Measurement】

1. Micrometer (accuracy 0.01mm)

Outside micrometer: 0~25 / 25~50 etc.

Inside micrometer

Depth micrometer

2. Caliper (accuracy 0.02mm)

Vernier caliper

Digital caliper

Depth / height caliper

3. Comparator (accuracy 0.001mm)

Mechanical / optical / inductive / pneumatic

4. Gauge blocks (the datum)

Accuracy: grade 0/1/2/3

Used in combinations

【Measurement of Form and Position Errors】

1. Straightness

A straight edge + a feeler gauge (simple)

A level + a bridge plate (guideways)

A autocollimator (precision)

A laser interferometer (ultra precision)

2. Flatness

An optical flat + the interference method (small flat surfaces)

A level + the diagonal method

CMM scanning

3. Roundness

A roundness tester (a rotary accuracy of 0.01μm)

A V-block + a dial indicator (simple)

CMM

4. Cylindricity

Multiple sections on a roundness tester

CMM

5. Parallelism

A dial indicator + a surface plate

6. Perpendicularity

A square + a feeler gauge

A dial indicator + an angle plate

7. Coaxiality

A dial indicator + a V-block

CMM

8. Runout

A dial indicator + centers

Circular runout / total runout

【Surface Roughness Measurement】

1. Stylus roughness tester

A diamond stylus scans

Ra/Rz/Ry/Rmax

Accuracy 0.01μm

Measurement range Ra0.005~50

2. Optical roughness tester

Non contact

Suited to soft materials / ultra precision surfaces

3. Comparison specimens

Visual / tactile comparison

A quick shop floor check

【Roughness Evaluation】

Sampling length l:

Ra>2: l=2.5mm

0.1<Ra<2: l=0.8mm

Ra<0.1: l=0.25mm

Evaluation length: 5×l

Parameters:

Ra — the arithmetic mean deviation of the profile (the most widely used)

Rz — the maximum height of the profile (the average of 5 points)

Ry — the maximum peak to valley height of the profile

Rsm — the mean spacing of the profile irregularities

Rtp — the profile support length ratio

【Machining Methods Corresponding to the Roughness】

Ra50: rough turning / rough milling / sawing

Ra25: rough turning / rough planing

Ra12.5: semi-finish turning / semi-finish milling

Ra6.3: finish turning / finish milling

Ra3.2: finish turning / finish milling / boring

Ra1.6: finish turning / finish boring / reaming / finish milling

Ra0.8: grinding / fine reaming / fine boring

Ra0.4: grinding / honing / fine grinding

Ra0.2: fine grinding / lapping

Ra0.1: lapping / super finishing

Ra0.05: super finishing / mirror grinding

Ra0.025: mirror grinding / chemical polishing

【Precautions When Measuring】

1. The measuring direction is perpendicular to the machining texture

2. The sampling length is selected according to Ra

3. Measure at several points and take the average

4. The surface is clean and free of oil

5. Calibrate the instrument regularly

【Statistical Process Control (SPC)】

Collect the data → draw the control chart → identify the anomalies → correct

X-R chart / histogram / Cp / Cpk

Cpk>1.33 (the process capability is sufficient)

Machining Error Analysis and Routes to Higher Accuracy

【Classification of Errors】

1. Systematic error

It follows a pattern and can be compensated

- The geometric error of the machine

- Tool wear (progressive)

- Thermal deformation

- The principle error (approximate machining)

2. Random error

No pattern, it cannot be predicted

- Uneven blank hardness

- Variations in the cutting force

- The clamping error

- The measurement error

【Sources of Error】

1. Machine error

- The spindle rotational error (radial runout / axial play)

- The guideway straightness / parallelism

- The transmission chain error (leadscrew / gears)

- Thermal deformation (spindle / leadscrew / bed)

2. Tool error

- The manufacturing error (the nose shape / the dimensions)

- The setting error (the tool height / the tool angles)

- Wear (continuous and progressive)

3. Fixture error

- The locating error (the datum does not coincide)

- The manufacturing error (the locating face / the guiding elements)

- Wear

4. Workpiece error

- The blank error (an uneven allowance → the cutting force changes → deformation)

- The internal stress (deformation on release)

- Elastic deformation (the cutting force / the clamping force)

5. Measurement error

- The gauge error

- The measurement method

- The environment (temperature / vibration)

- The operator

6. Setting error

- The tool setting error

- The trial cutting error

【Methods of Error Analysis】

1. Statistical analysis

- Measure several workpieces

- A histogram / a normal distribution

- Distinguish the systematic from the random error

2. Item by item analysis

- Calculate each error source independently

- Combine them into the total error

3. The experimental method

- Change one factor and observe the result

- Find the main factor

【Combining the Errors】

Systematic (an algebraic sum):

Δsys = ΣΔi

Random (the root sum of squares):

Δran = √(ΣΔi²)

Total error:

Δtotal = Δsys + Δran

【Routes to Higher Machining Accuracy】

1. Reducing the error sources

- A high accuracy machine

- Precision tooling / fixtures

- Controlling the blank quality

2. Error compensation

- Backlash compensation

- Lead error compensation

- Thermal error compensation

- Tool wear compensation

3. Error averaging

- Honing / lapping (multi-point contact averages it out)

- Multi-tooth machining (hobbing / gear grinding)

4. Error transfer

- Transfer the straightness to the measuring datum

- Use a high accuracy template / gauge

5. Error grouping

- Assemble in groups by size

- The error within each group is small

6. In-situ machining

- Machine it on the machine itself (eliminates the clamping error)

- Example: a lathe turning its own chuck flange

7. Active measurement

- Measure in real time during machining

- Stop automatically when the size is reached

8. Adaptive control

- Adjust the parameters in real time

- Compensate the deformation / the wear

【Typical Error Control】

1. Roundness error

- Improve the spindle accuracy

- Reduce the cutting force (a sharp tool)

- Cool adequately

2. Cylindricity error

- Reduce the tool wear

- Repair the steady rest / the follower rest

- Reverse feed (slender shafts)

3. Coaxiality

- Machine in one setup

- Mount between centers

- Improve the fixture accuracy

4. Flatness

- Reduce the clamping deformation

- Machine both sides alternately several times

- Cool adequately

5. Surface roughness

- Optimise the cutting parameters

- Reduce the vibration

- Improve the tool geometry

- Cool adequately

Statistical Process Control (SPC) for Machining Quality

【Purpose of SPC】

Monitor the process stability through statistical methods

Detect anomalies (non-random) in good time

Prevent defective products

【Principle of the Control Chart】

A normal process: the data follows a normal distribution

μ±3σ contains 99.73%

Going outside the control limits = an anomaly

【Common Control Charts】

1. Variable data (continuous)

X-R chart: mean and range (the most common)

X-S chart: mean and standard deviation

X-MR chart: individual values and the moving range (small batches)

2. Attribute data (discrete)

P chart: the non-conforming rate

NP chart: the number of non-conforming items

C chart: the number of defects

U chart: the number of defects per unit

【Using the X-R Chart】

1. Collect the data (20~25 subgroups of 4~5 pieces each)

2. Calculate the mean X̄ and the range R of each subgroup

3. Calculate the grand mean X̄̄ and the average range R̄

4. Calculate the control limits:

X chart: UCL = X̄̄ + A2·R̄

CL = X̄̄

LCL = X̄̄ - A2·R̄

R chart: UCL = D4·R̄

CL = R̄

LCL = D3·R̄

(the constants A2/D3/D4 are looked up in a table; for n=5, A2=0.577, D4=2.115)

5. Plot the chart and interpret it

【Rules for Detecting an Anomaly】

1. Out of control: a point goes outside the control limits

2. A run: 7 consecutive points on the same side of the center line

3. A trend: 7 consecutive points rising / falling

4. A cycle: periodic fluctuation

5. Near the limit: 2/3 of the points are outside 2σ

【Process Capability Indices】

1. Cp (potential capability)

Cp = (USL-LSL)/(6σ)

USL/LSL: the upper and lower specification limits

σ: the process standard deviation

2. Cpk (actual capability)

Cpk = min((USL-μ)/(3σ), (μ-LSL)/(3σ))

Takes the shift of the mean into account

3. Evaluation criteria

Cpk<1: not acceptable (insufficient process capability)

Cpk=1: marginal (99.73% acceptable)

Cpk>1.33: sufficient (the general requirement)

Cpk>1.67: abundant (precision parts)

Cpk>2: excellent (Six Sigma)

【Example of a Process Capability Calculation】

Bore φ20±0.05 (USL=20.05, LSL=19.95)

Sample 30 pieces, measured:

Mean μ=20.02

Standard deviation σ=0.012

Cp = (20.05-19.95)/(6×0.012) = 1.39

Cpk = min((20.05-20.02)/(3×0.012), (20.02-19.95)/(3×0.012))

= min(0.83, 1.94) = 0.83

Cp is sufficient but Cpk is not (the mean is too high)

The mean must be adjusted downwards

【Steps for Implementing SPC】

1. Identify the critical parameters (CTQ)

2. Select the type of control chart

3. Collect the data (initial)

4. Establish the control limits

5. Daily monitoring

6. Handling the anomalies

7. Continuous improvement

【Range of Application】

1. Critical dimensions (the bore diameter / the length)

2. Form and position tolerances (roundness / coaxiality)

3. Surface quality (the roughness)

4. Assembly parameters (the torque / the clearance)

5. Machining parameters (the temperature / the pressure)

【Benefits of SPC】

1. Less scrap (prevention beats inspection)

2. Stable quality

3. Identifies the main problems

4. Continuous improvement

5. Data driven decisions

6. Customer confidence (quality evidence)

Machining Defects and Non-Conforming Product Handling

【Common Machining Defects】

1. Dimensional out of tolerance

Causes: tool wear / tool setting / thermal deformation / measurement

2. Form and position error

Causes: clamping / the machine / the stress / thermal deformation

3. Poor surface roughness

Causes: the cutting parameters / the tool / vibration

4. Surface defects

- Scratches (chips / clamping)

- Burns (the grinding temperature)

- Cracks (the stress / heat treatment)

- Gas pores (casting)

- Slag inclusions (casting / welding)

5. Position error

- Hole wander (the drill wandering)

- Coaxiality (the clamping / the machine)

- Symmetry (the datum / the indexing)

【Classification of Non-Conforming Products】

1. Rework

It is machined again to become acceptable

Example: a hole is too small → ream it up to size

2. Repair

It is usable after the repair but it is not in its original state

Example: a worn journal → thermal spray + grinding

3. Regrade

It is used at a lower grade (applications with lower accuracy requirements)

Example: a high accuracy part → a general accuracy part

4. Scrap

It cannot be repaired or downgraded

Example: severe cracks / missing material

【Handling Process】

1. Identification (a red tag)

2. Isolation (prevents mix ups)

3. Recording (a description of the defect / the cause)

4. Analysis (the root cause)

5. Decision (rework / repair / regrade / scrap)

6. Handling (carry out the decision)

7. Verification (inspect after the handling)

8. Recording (filing)

【Common Rework Methods】

1. An external diameter is too small → chrome plate / thermal spray / grind down to the next size

2. An external diameter is too large → grind it to size (when enough allowance is left)

3. A hole is too small → ream it out / bore it

4. A hole is too large → fit a liner / electroplate / plug and re-drill

5. A damaged thread → tap a size larger / fit a thread insert

6. Poor flatness → grind / scrape

7. A poor surface → polish / grind

【Precautions for Rework】

1. The part must be re-inspected after the rework

2. Rework is prohibited on critical parts (aerospace / medical)

3. The rework record is filed

4. Repeated rework may affect the performance

5. Take care with the temperature on heat treated parts

【Scrap Criteria】

1. An out of tolerance dimension that cannot be repaired

2. Severe cracks / fractures

3. Material defects (inclusions / gas pores / shrinkage porosity)

4. A failed heat treatment (the hardness does not meet the requirement)

5. A critical performance failure

6. The rework cost > the cost of a new part

【Scrap Process】

1. Scrap application (describe the reason)

2. Approval (the technical / the quality department)

3. Scrap execution (destructive marking)

4. Recording (the quantity / the cost)

5. Recycling (the metal returns to the furnace)

6. Cause analysis (prevents a recurrence)

【8D Report (Quality Problem Handling)】

1. D1: form the team

2. D2: describe the problem

3. D3: interim measures (containment)

4. D4: the root cause

5. D5: select the permanent measures

6. D6: implement the permanent measures

7. D7: prevent recurrence

8. D8: recognise the team

【Preventing Non-Conforming Products】

1. First article inspection (at the start of each batch)

2. Process patrol inspection (timed / a set quantity)

3. SPC statistical control

4. 100% inspection (critical parts)

5. Poka-Yoke (mistake proofing)

6. Operator self inspection

7. Process optimisation

8. Training

9. Equipment maintenance

10. Supplier management

First Article Inspection and In-Process Inspection for Machining

【First Article Inspection】

The first piece is fully inspected at the start of each batch

Purpose: confirm that the process / the equipment / the tooling / the parameters are correct

Prevents a batch of non-conforming products

【When to Perform the First Article Inspection】

1. At the start of each shift

2. After changing the tool

3. After changing the fixture

4. After modifying the program

5. After changing the operation

6. After repairing the equipment

7. After a material batch change

8. After a change of operator

【Contents of the First Article Inspection】

1. Dimensions

- The critical dimensions are 100% inspected

- The general dimensions are sampled

- The gauges are calibrated

2. Form and position tolerances

- The critical faces

- The mating faces

3. Surface quality

- The roughness

- The defects (cracks / burns / scratches)

4. Assembly requirements

- The fits

- The positions

5. Marking / appearance

- The marks

- The colours

- The burrs

【First Article Inspection Process】

1. The operator self inspects

2. The inspector does a dedicated inspection

3. The quality engineer confirms it (critical parts)

4. The first piece is marked (a tag / a record)

5. It is retained until the batch ends

6. Batch production starts

【Handling a Non-Conforming First Article】

1. Stop production

2. Analyse the cause (man / machine / material / method / environment)

3. Adjust

4. Repeat the first article inspection

5. Produce once it is acceptable

6. Record it (to prevent a recurrence)

【In-Process Inspection (Patrol Inspection)】

Periodic sampling during batch production

Purpose: monitor the process stability

【Patrol Inspection Methods】

1. Timed patrol inspection

- Every 1~2 hours

- The critical parameters

2. Quantity based patrol inspection

- Every 10~50 pieces

- Fully inspect the critical dimensions

3. Mistake proofing detection

- 100% automatic inspection

- The non-conforming parts are rejected automatically

4. An SPC control chart

- On-line measurement

- A control chart

- An anomaly alarm

【Contents of the Patrol Inspection】

1. Dimensions (the critical dimensions)

2. Surface quality

3. The tool condition (the wear)

4. The workpiece temperature (thermal deformation)

5. The cutting fluid (the concentration / the pH)

6. The clamping condition

【Patrol Inspection Records】

1. The inspection data

2. The time / the operator

3. Any anomalies

4. The corrective measures

5. The non-conforming product disposition

【Quality Gates】

A quality gate is set at a critical operation

The part may only flow on once the inspection passes

Typical quality gates:

1. Roughing → semi-finishing (the datum)

2. Before and after heat treatment (the hardness)

3. After finishing (the critical dimensions)

4. Before assembly (the fits)

5. Before shipment (the finished part)

【Final Inspection (of the Finished Part)】

1. The 100% inspected items

- The critical dimensions

- The function

- The appearance

- The safety related items

2. The sampled items

- The general dimensions

- The performance

- The packaging

3. The inspection report

- The result of each item

- The non-conforming items

- The handling opinion

4. The certificate of conformity

- The inspector signature and stamp

- The date

- The batch

【Gauge Management】

1. Calibration (a one year cycle)

2. Check before use

3. Identification (the calibration status)

4. Storage (prevents rust / shock)

5. Scrapping (out of tolerance / damaged)

【Inspector Qualifications】

1. Trained and certified

2. The operation of the gauges

3. Drawing interpretation

4. Mastery of the standards

5. Regular assessment

6. Certified to work (critical parts)

Process Optimisation and Lean Production

【Goals of Process Optimisation】

1. Improve the quality (fewer defects)

2. Improve the efficiency (shorten the takt)

3. Reduce the cost (material / labour / equipment)

4. Improve the flexibility (fast changeover)

5. Safety (people / equipment)

【Optimisation Methods】

1. The Value Stream Map (VSM)

It analyses the material / information flow

It identifies the value added / the non value added

It eliminates the waste

2. The Takt Time

The rhythm of the customer demand

Takt = the available time / the demand

Example: 480min/96 pieces = 5min per piece

The operation time should be ≤ the takt

3. One Piece Flow

One piece flows through the operations at a time

It reduces the work in progress

Problems are found quickly

It replaces the batch production

4. SMED (Quick Changeover)

Convert the internal changeover (the machine is stopped) into an external one (the machine keeps running)

The goal is <10 minutes

Steps:

a. Distinguish the internal from the external

b. Move the internal to the external

c. Standardise

d. Shorten the internal

5. The 5S Management

Sort / Set in order / Shine / Standardise / Sustain

A tidy workplace

6. Poka-Yoke (Mistake Proofing)

Design so that an error is impossible

Example: an asymmetric hole (prevents fitting it the wrong way round)

7. Visual Management

A board / labels / colours

The problems become visible

8. Standard Work

The standard process / time / work in progress

It is the basis of the improvement

【The Seven Wastes】

1. Overproduction (the most serious)

2. Waiting

3. Transportation

4. Over-processing

5. Inventory

6. Motion (unnecessary actions)

7. Defects (rework / scrap)

【Steps of Process Optimisation】

1. Analyse the current situation

- Measure the time of each operation

- Identify the bottleneck

- A value stream map

2. Identify the waste

- Waiting / transportation / inventory

- Over-processing

3. The improvement plan

- Combine / split the operations

- Upgrade the equipment

- Improve the tooling

- Optimise the parameters

4. Implement

- A small batch trial

- Training

5. Standardise

- The work instructions

- The control plan

6. Continuous improvement (PDCA)

- Plan

- Do

- Check

- Act

【Typical Improvement Cases】

1. Reducing the number of setups

Before: face turning → turn round and turn the OD → turn round and bore (3 times)

After: a CNC lathe completes it in one setup

Effect: the time is reduced by 50%, the accuracy improves

2. Reducing the transportation

Before: lathe → intermediate store → mill → intermediate store → drill

After: a machining center completes it in one operation

Effect: the work in progress is reduced by 80%

3. Quick changeover

Before: a 2 hour changeover

After: 15 minutes with SMED

Effect: the equipment utilisation improves

4. Tooling optimisation

Before: high speed steel, 50 pieces per edge

After: coated carbide, 500 pieces per edge

Effect: the tool change time is reduced by 90%

5. Optimising the cutting parameters

Before: vc=80m/min (from experience)

After: simulation + trials, vc=150m/min

Effect: the takt is shortened by 40%

【Principles of Lean Production】

1. Pull production (to the demand)

2. Production to takt

3. One piece flow

4. Zero defects

5. Continuous improvement

6. Standardisation

7. Visualisation

8. Flexibility (multi-skilled workers)

【Digital Lean】

1. An MES system (execution tracking)

2. Real time data (the equipment OEE)

3. The digital twin (simulation optimisation)

4. AI prediction (demand / quality / maintenance)

5. The Internet of Things (the equipment is interconnected)

【Implementation Recommendations】

1. Support from the top management

2. The participation of everyone

3. Training first

4. A pilot → then a rollout

5. Continuous rather than a one off effort

6. Data driven

7. Respect for people (the improvement suggestions)

Related quick references: Machining FundamentalsCutting Tool MaterialsTool GeometryTurning ProcessMilling ProcessDrilling ProcessBoring ProcessGrinding ProcessMachining AllowanceProcess SequencingTypical ProcessesCNC ProgrammingFixture DesignSpecial Machining Processes

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL