Pitfall: sensor signal cables run in the same wire duct as the motor / VFD power lines
Consequence: electromagnetic interference → false signals / loss of control
Correct practice: route signal cables and power lines separately (spacing ≥200mm)
Pitfall: the PLC output directly drives a contactor / solenoid valve (>2A)
Consequence: the PLC contacts burn out
Correct practice: the PLC output drives an interposing relay (24V coil) → the relay contacts drive the heavy load
Pitfall: an ordinary latching pushbutton (non-safety type) is used as the E-stop button
Consequence: it cannot be reliably opened after actuation → the safety circuit fails
Correct practice: the E-stop button must be a mushroom-head / red / twist-to-reset type (ISO 13850)
Pitfall: a high-power motor (>15kW) is started direct-on-line at full voltage
Consequence: the starting current is 6~8× the rated current → voltage dip → affects other equipment
Correct practice: star-delta / soft start / VFD starting
A signal isolator (4~20mA) should be added on the PLC analog output to the VFD / without it → interference → VFD malfunctions
When a 4~20mA signal cable is >200m, the signal attenuates / add an isolator / switch to RS485 communication / shorten the cable
The VFD / servo drive ground conductor should be independent / a shared ground → interference → motor jitter / ground conductor ≥4mm² / ground resistance ≤10Ω
In addition to the hardware E-stop circuit / the PLC program should implement E-stop logic (all outputs reset on E-stop) / skipping it → the hardware cuts power but the program keeps the outputs on
The PLC input filter time defaults to 10ms / fast signals (<5ms) → not detected / reduce the filter setting (1~5ms)
The safety circuit must use a safety relay (redundant + self-checking) / an ordinary relay → contact welding → the safety function fails
Stepper driver current set too high → the motor overheats / too low → insufficient torque / set it to the motor rated current (peak / RMS)
PLC digital outputs should be fitted with fuses (0.5~1A) / no fuse → a load short circuit → the PLC module burns out → production stops
DC24V and AC220V loads must not be mixed on one PLC output module → different voltages → risk of short circuit → isolate with relays
Cables inside the electrical control cabinet should be routed in wire ducts and fixed with cable ties / no ducts → messy → difficult maintenance
The electrical control cabinet should have a grounding busbar (for centralized PE conductors) / none → poor grounding → safety risk
Keep the VFD and PLC at least 200mm apart / too close → electromagnetic interference → PLC malfunctions
Other quick references in this series:Welding PitfallsCasting PitfallsShaft System PitfallsSheet Metal PitfallsAssembly PitfallsHydraulic PitfallsPneumatic PitfallsShaft System DesignHousing DesignWelded StructuresSheet Metal StructuresSpring DesignBolted JointsBearing Arrangement