Design Pitfalls for Large Welded Structures

(1) Pitfall: welds concentrated on large structures

Correct practice: keep weld spacing ≥200 mm and avoid cross-shaped weld intersections

(2) Pitfall: no preheat before welding thick plate (>40 mm)

Correct practice: preheat to 100~150 ℃ for plate ≥40 mm, 150~200 ℃ for ≥60 mm

(3) Pitfall: no stress-relief annealing after welding

Correct practice: large welded structures must be stress-relieved at 580~620 ℃, soaking 1 h per 25 mm

(4) Pitfall: groove design too small

Correct practice: double-sided weld land ≤2 mm; single-sided root-pass land ≤1 mm

Design Pitfalls for Mining Machinery Structures

(1) Pitfall: impact loads not considered in mining machine structures

Correct practice: use a safety factor of 2~3 times the static load and fit buffers

(2) Pitfall: liner bolts spaced too far apart

Correct practice: liner bolt spacing ≤300 mm, always with lock nuts + spring washers

(3) Pitfall: poorly placed lubrication points

Correct practice: large bearing housings need a centralized lubrication system with accessible points

(4) Pitfall: no liner at discharge ports or chutes

Correct practice: line all material-contact faces of chutes with wear plate (10~20 mm thick)

Design Pitfalls for Belt Conveyor Structures

(1) Pitfall: no belt-tracking devices at head or tail

Correct practice: fit self-aligning idlers (one set every 6~10 m)

(2) Pitfall: no anti-slip device on steep inclines

Correct practice: above 18° use a chevron belt or add cleats

(3) Pitfall: loading point off-center

Correct practice: loading chute centerline offset from the belt centerline ≤5 mm

(4) Pitfall: insufficient take-up travel

Correct practice: screw take-up travel ≥1%~1.5% of conveyor length

gravity take-up travel ≥2× the elastic elongation plus allowance

Design Pitfalls for Heavy-Duty Gear Drives

(1) Pitfall: wrong tooth hardness selection. Correct practice: pinion 30~50 HB harder than the wheel; for tooth surfaces ≤350 HB use quenched-and-tempered + induction hardening

(2) Pitfall: root fillet too small. Correct practice: R ≥0.38 m; a small fillet leads to fatigue fracture

(3) Pitfall: wrong lubrication. Correct practice: dip lubrication at v ≤12 m/s, spray above 12 m/s, extreme-pressure gear oil for heavy loads

Design Pitfalls for Large Forging Processes

(1) Pitfall: insufficient forging reduction. Correct practice: carbon steel ≥2.5, alloy steel ≥3.0, critical parts such as main shafts ≥4.0

(2) Pitfall: heating too fast causes internal cracking. Correct practice: ≤30 ℃/h below 300 ℃, ≤60 ℃/h from 300 to 800 ℃

(3) Pitfall: final forging temperature too low. Carbon steel 800~850 ℃, alloy steel 850~950 ℃

Design Pitfalls for Steel Structure Weld Joint Fatigue

(1) Pitfall: cross joints not ground. Correct practice: weld-toe stress concentration factor is 2~3; must grind 0.5~1 mm

(2) Pitfall: welding residual stress ignored. Correct practice: residual stress can reach yield strength; post-weld heat treat at 600~650 ℃ or peen

(3) Pitfall: no transition at stiffener ends. Correct practice: provide a transition fillet R ≥50 mm at stiffener ends

Design Pitfalls for Mining Crushers

(1) Pitfall: insufficient frame stiffness. Large jaw crusher frame wall ≥30 mm thick, rib spacing ≤500 mm

(2) Pitfall: liner bolts not locked. Use lock nuts + spring washers and check torque monthly

(3) Pitfall: poor bearing lubrication. Large crushers use forced-circulation lubrication; fill the grease cavity 1/3~1/2

Other quick references in this series:Welding PitfallsCasting PitfallsShaft System PitfallsSheet Metal PitfallsAssembly PitfallsHydraulic PitfallsPneumatic PitfallsShaft System DesignHousing DesignWelded StructuresSheet Metal StructuresSpring DesignBolted JointsBearing Arrangement

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL