The part is not completely filled and there is an unfilled region at the end.
① Insufficient shot volume (not enough plasticized material)
② Injection pressure or speed too low
③ Barrel temperature too low (poor melt flowability)
④ Mould temperature too low (the melt freezes too early)
⑤ Poor venting (gas blocks the melt flow)
⑥ The gate is too small or badly positioned
⑦ The part wall is too thin (short shots occur very easily below 0.5mm)
① Check the location of the short shot (at the end or in the middle?)
② Short shot at the end → a material volume or pressure problem
③ Local short shot → a venting or gate problem
① Increase the shot volume by 10%~20%
② Increase the injection speed by 30%~50%
③ Raise the barrel temperature by 10~20℃
④ Raise the mould temperature by 10~20℃
⑤ Add vent grooves
⑥ Enlarge the gate
⑦ Increase the part wall thickness
Snake-like folds or wavy patterns appear near the gate.
The melt enters the cavity at high speed from the gate without clinging to the cavity wall, forming a jet that folds over and leaves a surface defect.
The defect extends outward from the gate area
Jet marks often appear directly opposite the gate
① Reduce the injection speed (especially the first 20% of filling)
② Enlarge the gate (so the melt enters at low speed)
③ Change the gate position (so the melt impacts the cavity wall and then fills gently)
④ Use a fan gate / overlap gate to spread the jet
⑤ Raise the mould temperature so the melt clings to the wall more easily
⑥ Use a submarine gate so the melt hits the wall before filling
Gas bubble: round and transparent, near the part surface
Void: irregular shape, at the center of a thick wall
① The raw material was not dried (moisture vaporises)
② Air in the raw material was not removed (insufficient back pressure)
③ Lubricant or additive volatilises
① Uneven wall thickness (the thick area shrinks more and forms a cavity)
② Insufficient holding pressure
③ Holding time too short
④ The gate freezes too early
Gas bubbles: ① dry the raw material thoroughly ② raise the back pressure by 30%~50% ③ lower the melt temperature by 10~20℃
Voids: ① increase the holding pressure by 20%~30% ② extend the holding time ③ enlarge the gate ④ extend the cooling time
Related quick references: Injection Molding ProcessStamping ProcessDie Casting ProcessSurface TreatmentMold StructureRunner SystemCooling SystemMold MaterialsPlastic MaterialsMold MachiningHot Runner SystemAutomotive MoldsForging Dies